SpeechesTransportation

Stephen Hammond – 2022 Speech on the Future of Rail Services

The speech made by Stephen Hammond, the Conservative MP for Wimbledon, in Westminster Hall, the House of Commons, on 20 December 2022.

I beg to move,

That this House has considered the future of rail services.

It is a pleasure to see you in the Chair, Mr Robertson. I want to thank Mr Speaker for giving me the opportunity to host this debate. I have always believed that rail is critical to the success of our country. It connects our cities, towns and communities; it drives economic regeneration and growth; it is the employer of the present but also of the future, as new technological skills will be required; and it is the key to achieving many of our decarbonisation ambitions.

It is clear that the pandemic has caused many industries catastrophic problems, and the rail industry is no different. When covid hit, ridership fell to about 4%, which was a record low. Train operating companies that had been providing the Treasury with £100 million every four weeks were requiring a subsidy of something like £600 million. The franchise system—which had been broadly successful from 1992 to 2016, when it experienced a number of problems—collapsed and the Government became the operator of last resort.

It is not the case that all the problems of the industry came merely from the pandemic. The franchising system had worked well until 2016, but the more prescriptive franchising system set out in that round saw too much prescription and too little room for initiative. A distinguished predecessor of my hon. Friend the Minister recounts a story of how he was required to set the time of the last train from Southampton to Bournemouth. It should never be the role of Ministers to set timetables. There was too much interference.

Network Rail was the cause of 80% of the delays, which is what caused most passenger dissatisfaction. The new timetable that was introduced in 2018 collapsed in September that year, which triggered the response from the Department to have the Williams review. It is true that the Williams review took some time, but it has now come forward and highlighted some problems. There are some very good elements of the Williams review. I have already mentioned the incentives to decarbonisation and the suggestion that no one disagrees that the industry needs a guiding mind.

Equally, however, the review has embedded a number of problems. The concept of the guiding mind, the acceptance that the railways can drive social mobility and a cleaner, greener transport system, and that technology must be at the heart of future investment, are all absolutely key. However, I want to concentrate on two flaws of the Williams plan. First, the creation of Great British Railways as the guiding mind, the system operator, maintainer, enhancer and controller of operations, with the setting of passenger service contracts, safety and ticketing—I could go on—is to all extents and purposes the renationalisation of the railway system. Some in this room might think that is a good idea. Those of us old enough to have experienced British Rail will realise that no one in future would want to wear such rose-tinted glasses.

There is also concern that there is too little emphasis in the plan on the benefits that the private sector has brought to the railway. It gives no incentive for operators to offer an enhanced service, and suggests little punitive action if it is a poor service. The passenger service operating contracts may well be a short-term palliative, but if adopted in the long run they would drive the private sector from the industry.

Jim Shannon (Strangford) (DUP)

I commend the hon. Gentleman for securing this debate. The key thing for me is the customer, and I know that that is the key thing for him as well. Does he agree that connectivity is essential to rural communities? The ability to jump on the tube or a train is missing in too many communities. We must look at not simply holding on to what we have, but at expanding the network so that we can tackle rural isolation. That is what the customer wants.

Stephen Hammond

The hon. Gentleman is exactly right. If he listens to my speech later on, he will hear me say that the passenger must be at the heart of the new railway system. The new system needs not to go back to what it was previously but to evolve. In a few moments’ time, he will hear me make that point.

I have always been in favour of privatised railways, although I accept that there are some legitimate criticisms. However, the creation of a not just fat but staggeringly obese controller at the centre and heart of a hybrid railway system is likely to be the worst of all worlds. I can only echo the view of so many senior rail experts who believe that, as the Government are soon to finalise their plans, now is the time and opportune moment to consider not just the best of the Williams-Shapps proposals but radical change.

The first test of this iteration of the Government’s plans has come with the recently announced SoFA—statement of funds available—for control period 7, which is £44 billion. That is a huge sum of money, but it is £4 billion less than the amount given for control period 6. That partly reflects the fact that, while Network Rail has excellent leadership at the top, all too often there are layers of permafrost that stifle initiative, do not give clear prioritisation to investment plans and do not get them delivered. In some cases, they have prioritised engineering over the customer. I reiterate that if this money is to be used sensibly, as I will say in a few minutes’ time, it is absolutely clear that the future plans for this industry must have well-defined, accountable plans for investment.

I have also looked at the HLOS—the high-level output specification—which was even more revealing, probably for what it did not say as much as what it did say. I saw no reference in the HLOS to either the rail review or Great British Railways. Although I accept that I may well be overinterpreting the HLOS, the optimist in me thinks that that means that the Government are actually signalling that they intend to revise their proposals.

Disappointingly, there was no reference to encouraging the participation of the private sector in the development of projects nor in the financing or funding of specific projects, despite that being one of the core suggestions that the transition team works on as it moves from the old system to the new. In response to the point about connectivity made by the hon. Member for Strangford (Jim Shannon), I accept that paragraph 24 of the HLOS refers to engaging with regional transport authorities, but I believe that local, regional and national schemes are all equally important. I hope the Minister will confirm that that was an error of omission rather than intent.

Richard Foord (Tiverton and Honiton) (LD)

Is the hon. Member aware of the very good example of rural connectivity with the recent reopening of Okehampton railway station in Devon? Is he also aware of the potential for rural connectivity at Cullompton railway station, which is also in Devon?

Stephen Hammond

Interestingly enough, in my first life in this place I was the Opposition spokesperson on railways for four years, and for two years I was the Minister for rail, so I know all about Okehampton station and what it might bring forward.

That refers back to the point I made a moment ago that, with clear prioritisation of investment and the right incentives to operators, there is absolutely no reason why regional and local investment should not be seen to be just as important as national investment. Indeed, the point I made at the beginning, about rail being the key to regeneration and economic growth in a number of communities, underlines the point that the hon. Gentleman was making.

Martin Vickers (Cleethorpes) (Con)

I wish to make that very point about economic growth and investment in an area. As the Minister knows, I have been campaigning for the restoration of the three trains between Cleethorpes and King’s Cross for many years and they now appear in the London and North Eastern Railway draft timetable for next May. When the Minister sums up, will he comment on whether those services are likely to happen? As my hon. Friend said, economic growth and investment are crucial to the regeneration and levelling up of many of our more deprived areas.

Stephen Hammond

It is 20 December, but already many hon. Members wish my hon. Friend the Minister to become Father Christmas in his summing up. As it is Christmas, and given he is a great friend of mine and an acknowledged expert in this field, may I offer him a few Christmas cracker thoughts about how I would like to see him use this opportune moment by accepting the best from the Williams-Shapps plans but also looking at what could be done to make our rail system even better?

A moment ago I referred to “the staggeringly obese controller”. One of the first things that could happen is that the Fat Controller could go on a new year diet. Everybody agrees that a guiding mind is needed for this industry. It would be right for Great British Railways to be turned into that guiding mind, with the clear objectives of setting timetables in conjunction with the infrastructure provider and operating companies, and being the body to set safety standards, let current contracts, see an evolution of the system and potentially oversee slot auctions.

If that is what Great British Railways is to become, then it is implicit that the infrastructure operator and maintainer should be separate from the guiding mind. If both functions were under that one body, it would make that body partial to the interests of network engineers rather more than to ensuring the satisfaction of passengers, freight operators and ticket operators. It does not matter what that separate entity is called—we could call it national rail, network rail or whatever we like—but I suggest to the Minister that setting Great British Railways up as the guiding mind and distinctly separating the role of infrastructure operator would be an excellent way forward.

John Penrose (Weston-super-Mare) (Con)

My hon. Friend is making an excellent speech. I want to back up his suggestion for a much more slimline future system operator for two reasons. First, if I understand his point correctly, that would put customers and passengers right at the front rather than system and network engineers, which is the right way round and the right order of priority. Secondly, that addresses the fundamental point that my hon. Friend raised at the start that the difficulties from 2016 onwards were of an overly centralised, overly controlled agglomeration of power. He suggests a dispersal and relaxation of that power, and a transfer of it out from the centre, which is essential if we are going to have the flexible system we need to adjust to the changes that the pandemic has brought.

Stephen Hammond

I am tempted to say that great minds think alike, because my next point is to suggest to the Minister that the Government should look at passenger service contracts. We all accept that the post-2016 franchising system and the pandemic have meant there is a need for change, but passenger service contracts are a journey rather than an end in themselves and the Government should look at what the end might be, so I suggest two things. I suggest that we should look at evolving mechanisms, so that there is a spectrum of possibilities for either new contracts or revised franchises that look at revenue risk, how it is shared, a range of revenue incentives, and a range of arrangements that in some cases would allow slot auctions as well as new franchises and that potentially ensure passenger service contracts in some areas. To that end, a commitment to review what is now in place after two years would allow that to happen. As I say, it would also provide for greater competition by introducing slot and route auctions—initially, I suggest, for a limited number of some of the long-distance routes. It would drive passenger satisfaction, encourage initiative and secure a future for open access, which had been one of the drivers for change, and for a range of competitions.

Some really exciting recommendations in the Williams-Shapps review should be kept. They include a steady programme of electrification alongside the utilisation of enhanced battery and hydrogen technology; new procurement processes based on whole-life value, with consideration of opex and social value, not just old-style cost-benefit analysis; and the provision of open data being more accessible and available to all industry participants. Those are some of the sensible, well-thought-through suggestions, as is the need for a guiding mind, but I hope the Minister will also accept that now is the right time, as I understand that the Government are looking to bring forward new plans or even a Bill in the new year. I hope he will accept the points I have made about separating the guiding mind from the infrastructure provider, giving a commitment to revise the spectrum of possibilities for train operating companies, and giving a commitment to see the private sector work alongside the public sector to deliver a clear, identified and accountable investment programme, so that all the money that is available for investment is spent in control period 7.

I am optimistic about the future of the railways, and I am particularly optimistic about their being in my hon. Friend the Minister’s hands, so I hope that he will accept that what I am trying to do—in a very thumbnail and headline way—is to set out some ideas that I think will make the future of the railways even more secure. I hope he will accept them as positive, constructive and implementable ideas, so that we have a railway that is fit for the 21st century.