Tag: Speeches

  • Jacob Young – 2021 Speech on the Integrated Rail Plan

    Jacob Young – 2021 Speech on the Integrated Rail Plan

    The speech made by Jacob Young, the Conservative MP for Redcar, in the House of Commons on 18 December 2021.

    The Tees Valley has a proud history as the home of our nation’s railway. Starting with George Stephenson’s revolutionary launch of the Stockton to Darlington railway in 1825, our region has been a pioneer in the development of Britain’s rail sector, from steel forged in the furnaces of Redcar for the construction of the London underground to the production of new trains at Hitachi in Newton Aycliffe.

    Recent announcements show our commitment to levelling up rail in Teesside. From next year, TransPennine Express services will be extended from Redcar Central to Saltburn, something I have been campaigning on for well over two years. As of next week, LNER will launch a direct service from Middlesbrough to London Kings Cross—a fantastic step, but we need more than just one a day. And the £l00 million redevelopment of Darlington train station creates new platforms, a new station building and the potential for more frequent services on the local network.

    The Tees Valley is also playing a huge role in the development of the wider national network, and a key way we can strengthen this role is by committing to using British-made steel from Teesside. HS2 is one of this Government’s biggest infrastructure projects but it has yet to commit to signing the UK steel charter. It is a false economy to continue to bail out our steel industry and not secure its pipeline through procurement rules in the UK. Using UK-sourced steel in the construction of HS2 will help us to secure the future of this vital national industry and support over 1,000 jobs in Redcar alone.

    This IRP delivers for the north, but there is more work to do. The Minister will know that I am pushing for the east coast main line to extend its services not just to Middlesbrough but to Redcar to complement our new freeport. Along with the Chief Secretary to the Treasury, I am supporting the return of passenger services to east Cleveland on the Boulby potash line, if we are able to achieve it. But as we rightly increase services on the Redcar line, such as the TransPennine service to Saltburn, we run the risk of cutting Redcar in half, virtually blockading our level crossings in the town centre. There is no doubt that resolving this roadblock to growth in Redcar will require significant funding, and there is no obvious solution right now, but I seek assurances from the Minister that Redcar town will not be cut off as we grow our network, and that we will seek to minimise the length of time the crossings are down. This is a Government committed to levelling up and transforming Teesside for the better. Thanks to this Government and our Conservative team across our region, we have never been better connected by rail, road and air. Long may it continue.

  • Toby Perkins – 2021 Speech on the Integrated Rail Plan

    Toby Perkins – 2021 Speech on the Integrated Rail Plan

    The speech made by Toby Perkins, the Labour MP for Chesterfield, in the House of Commons on 8 December 2021.

    Conservative Governments have made me angry before. Indeed, it was the Thatcher Government who first awoke my passion for politics, because I wanted to stand against everything that they stood for, but at least the Thatcher Government were competent. What we have now is a Government who are so incompetent, so inept, so irresponsible and so dishonest that they constantly let down the people who voted for them, and that is what we see in this plan for integrated rail.

    We need only look at the manifesto promises that we have had from the Tory Government—all the way back to 2010, when I was first elected and the hon. Member for Ashfield was working for a Labour MP—to see what the Tories have been all about. Throughout that time, we have seen manifestos promising that HS2 would be delivered. We saw those promises in 2010 and we saw them in 2015, and the Tories were also promising to electrify the midland main line in 2017. In 2019 they promised that they would listen to the Oakervee review, a detailed review of HS2, the costs of which were escalating because of the constant delays and ineptitude of this Government in implementing it.

    For 11 years HS2 has been Tory party policy, but throughout that period they have managed the policy so ineptly that the costs have continually escalated, and public confidence has not been there. Now they are asking how we can support policies that they spent four general elections and 11 years telling us were the right policies. They stand there and say that this is a major investment, but every major investment in rail that they have announced in the 11 years for which I have been here has never been delivered. They have stood there and announced midland main line electrification, and they have never delivered it. They have stood there and announced HS2, and they have never delivered it. So why on earth should anyone believe that the plan that is on that desk, which will take many years and future Parliaments to be delivered, will ever happen?

    The people of Chesterfield have been lied to, and people across the midlands and the north have been lied to, in order to get this shabby Government elected. It is no wonder that people throughout my constituency are finally starting to see what this Government really stand for. It makes me sick, Mr Deputy Speaker.

  • Matt Rodda – 2021 Speech on the Integrated Rail Plan

    Matt Rodda – 2021 Speech on the Integrated Rail Plan

    The speech made by Matt Rodda, the Labour MP for Reading East, in the House of Commons on 8 December 2021.

    It is a pleasure to speak in this important debate. I start by offering my wholehearted support to the shadow Transport Secretary, who has made an excellent contribution this afternoon, as have many other hon. Members across the House.

    I feel deeply sorry for many communities across the midlands and the north of England, because they have clearly been badly let down by the Government. I know the rail Minister is a decent, hardworking Minister, and I am sure even he is disappointed with this rather thin offering—the way Nottinghamshire has been let down, the way the north-west of England has been let down, the way Bradford and Sheffield have been let down. They have all been badly let down by the Government, I am afraid, and indeed colleagues in London are about to be severely let down with the looming crisis in Transport for London, where the Government are clearly unable to do the decent thing and provide the right level of support to vital transport infrastructure in the capital.

    All those things bode very badly for our country at a time when we need more investment and more economic growth. High-speed rail is clearly a driver of significant economic growth and regeneration for major cities and smaller towns, such as my Reading constituency, and offers huge advantages to communities across the country.

    I draw the Minister’s attention to a number of points in my own area. In particular, I call for greater Government focus on electrification of the Great Western line to the west of Reading; at present the electric line stops at Newbury, which is clearly not far enough to the west. Indeed, the far south-west is not served by adequate rail infrastructure at this time. The electric line also stops in Cardiff, Wales, and Welsh colleagues have mentioned the serious flaws with that lack of investment in their country.

    In addition, the north-south line that connects the south coast of England with the midlands and ultimately Manchester should be a priority for electrification. It is currently a narrow rail corridor with only one line going north and one going south. There are real issues there, but electrification offers greater efficiency, lighter rolling stock, much faster speeds on the railway and a more efficient railway all round. It requires more up-front investment, but it pays back great dividends in future. Many colleagues from Coventry and other midlands cities have mentioned that to me.

    I realise time is limited, but I also draw the Minister’s attention to a number of other issues, particularly Reading Green Park station in the neighbouring seat of Reading West, which also serves my constituents who commute to work in the science park at Green Park on the west of Reading. We also need investment in other stations across Berkshire. I draw his attention to the need for the Western Rail Link, another crucial piece of rail infrastructure in the Thames valley that offers wider benefits to people from across the country. I appreciate that he is interested in the project, and I urge him to speak to local councils, myself and other MPs such as the shadow rail Minister on that point.

  • Cat Smith – 2021 Speech on the Integrated Rail Plan

    Cat Smith – 2021 Speech on the Integrated Rail Plan

    The speech made by Cat Smith, the Labour MP for Lancaster and Fleetwood, in the House of Commons on 8 December 2021.

    It is a pleasure to speak in this debate on the disintegrated rail plan. I associate myself with the comments made by the hon. Member for Westmorland and Lonsdale (Tim Farron); I agree wholeheartedly with his points about rail connectivity outside the Liverpool-Manchester-Leeds corridor, and across Lancashire and Cumbria. It so often feels as though that part of the north is forgotten about. Just because we do not have big cities, it does not mean that we do not have jobs and industry, and a need for connectivity. Indeed, we have some very good projects that lend themselves to reasonably cheap electrification, which would help lower the carbon footprint of our public transport system.

    I will keep my remarks tightly focused on lines affected in my constituency. I must be clear: if HS2 ever gets as far north as us in Lancashire and Cumbria, which seems like something of a long shot, we cannot have trains not stopping in Lancaster. It is the county town of Lancashire. We have world-class universities and industries that need rail connectivity to the capital, and we need that investment. We cannot keep talking about rail connectivity as meaning getting to London faster. We must also talk about investing in the north and in our communities.

    I want to talk about Fleetwood, a town without a railway station, though it has been promised one. In November 2019, the Prime Minister came to Poulton-le-Fylde—and later got it muddled up with Bolton, but we will move on from that. He promised us that its rail line would be reconnected. We are still waiting. We have had £100 million for a plan, but so far, there is no indication that the line will materialise. I encourage the Minister of State, Department for Transport, the hon. Member for Pendle (Andrew Stephenson), who is on the Front Bench —a Lancashire guy—to look favourably on Fleetwood, and to work with us and the local community to make that rail line happen.

    I finish with some words from my constituents, because all too often the real impact is on constituents’ lives. Mark Waites asks, “Where’s the railway?” That is probably the No. 1 question that I am asked as a local MP—where is our railway in Fleetwood? The track bed is there, but there are no trains running up and down it. Jack Harrison offered me a festive quote to share in the debate:

    “Now all we want for Christmas, is our trains back;

    And no more empty election yackity yack.”

    That sums up the feeling across Fleetwood, and right across the Fylde coast, about the promises that the Government have made, but not delivered on. We have been promised that railway back.

    “Now that the Prime Minister knows where Fleetwood is, will he finally say when the railway connection will be reinstated to Poulton and the rest of the country?”

    That is a quote from my constituent Tony Johnson. I urge the Minister to look favourably at Lancashire and Cumbria, and to offer us the rail connection that we have been promised.

  • Ruth Edwards – 2021 Speech on the Integrated Rail Plan

    Ruth Edwards – 2021 Speech on the Integrated Rail Plan

    The speech made by Ruth Edwards, the Conservative MP for Rushcliffe, in the House of Commons on 8 December 2021.

    I feel privileged to speak in this debate, not simply because this fantastic £96 billion investment in rail is transformational for huge swathes of our country, and not just because we have sped up existing plans by around 15 years to bring real benefits to places such as my constituency of Rushcliffe. No—I feel particularly privileged because this debate gives us the chance to examine the habits and the utterances of that rare species, the Starma chameleon.

    For years, the Leader of the Opposition has manned the barricades in opposition to HS2. He said that he opposes HS2

    “on cost and on merit: it will not achieve its stated objectives.”—[Official Report, 15 September 2015; Vol. 599, c. 1006.]

    He called its impact devastating and said it would cause “wholly unacceptable damage”. However, all of a sudden, the Government have not gone far enough. Suddenly he believes that the plans are

    “a second-class option for the North”

    and the midlands. If the Leader of the Opposition had had his way, the people of Nottinghamshire, Derbyshire, Birmingham and Sheffield would not have had high-speed rail at all, but perhaps it only matters when it is in his own backyard—hardly prime ministerial.

    The integrated rail plan delivered on a commitment to level up regional connectivity by electrifying the midland main line, and electrification work is set to begin in the next phase, before Christmas. These improvements will be welcomed by my constituents, who, because of the plan, will find it a lot easier to commute and undertake other travel by train. Indeed, in my inbox, praise for this plan far outweighs criticism. As the Secretary of State and my hon. Friend the Member for Keighley (Robbie Moore) have said—in fact, as has been said repeatedly—the last Labour Government electrified 63 miles of track in 13 years. An ordinary British garden snail moving at a top speed of 0.048 kph would have made more progress.

    Colleagues may be surprised to hear that the Leader of the Opposition and I have something in common: we both represent constituencies containing planned HS2 stations, the only difference being that I did not petition against this massive upgrade to, and investment in, rail in my constituency. The integrated rail plan will deliver HS2 faster. It will slash train journey times between London and Nottingham by two thirds, and the journey time from Nottingham to Birmingham to only 26 minutes, which is half an hour faster than envisaged under previous plans. It will deliver HS2 right into the heart of the East Midlands freeport, where we are making a green jobs hub that will create over 60,000 jobs in the region.

  • Tim Farron – 2021 Speech on the Integrated Rail Plan

    Tim Farron – 2021 Speech on the Integrated Rail Plan

    The speech made by Tim Farron, the Liberal Democrat MP for Westmorland and Lonsdale, in the House of Commons on 8 December 2021.

    It is a pleasure to follow the hon. Member for High Peak (Robert Largan), who made a thoughtful contribution concerning his constituency.

    The integrated rail plan for the north is a real disappointment to many people, not least people from Cumbria, the furthest north-west county in England. When we leaf through the 162 pages of that document, we find not a single mention of the county of Cumbria. That is a reminder that when we talk about the north and levelling up the north, it feels to many of us that the rural north—rural communities generally, but specifically those in the far north-west of England—is not thought of and is very much overlooked.

    The cancellation of part of HS2 is deeply troubling, but of course the more troubling cancellation is that of Northern Powerhouse Rail. If one understands the north of England, one understands that what we really need is not to get to London a bit quicker, but to have greater capacity and to get from east to west more quickly. That has been overlooked by the Government. It is a betrayal of the north, yes, but more than that it is a betrayal of their lack of understanding of the north, which is more telling.

    I want to focus on a couple of things in my community. First, we appreciate that the HS2 line is not going to go further into Lancashire and into Cumbria, but nevertheless the trains will. I am deeply concerned that there are no plans for any of those HS2 trains to stop in the biggest visitor destination in the country apart from London, namely my constituency—the Lake district. That should be put right.

    We have a railway line from the main line at Oxenholme that takes us to Windermere—the Lakes line. It is a very short line, and it would be one of the cheapest electrifications in the country if only it were done. Sadly, the Government have cancelled that. I am, however, encouraged by recent conversations with the Rail Minister about the possibility of a passing loop at Burneside, which would give us the opportunity to effectively dual the line again—that was our Beeching cut back in the ’60s and ’70s. Doing that would double the capacity on the Lakes line and massively increase the number of people who could come to the Lake district and not come by car. That would be a huge positive.

    It is worth bearing in mind that there are many small things that are huge to us. At Staveley, the first station in the Lake district, there are 42 steps to get up to the station. Friends of mine who have disability issues, are elderly or need to use prams simply cannot use their local station, so I call on the Government to consider very carefully funding access to Staveley station.

    We have a world-class visitor destination in the Lake district, with what feels at the moment like a third-class rail connection. That is why I ask, finally, that the Government reconsider the electrification of the line from Oxenholme to Windermere, and of the Furness line from Lancaster to Barrow through my constituency. That would be a positive, carbon-neutral thing to do, and it would be a massive boost to tourism and to local communities. It would be a good, effective use of public money after this disappointment.

  • Robert Largan – 2021 Speech on the Integrated Rail Plan

    Robert Largan – 2021 Speech on the Integrated Rail Plan

    The speech made by Robert Largan, the Conservative MP for High Peak, in the House of Commons on 8 December 2021.

    First, I associate myself with the excellent speeches of my hon. Friends the Members for Harrogate and Knaresborough (Andrew Jones) and for Blackpool North and Cleveleys (Paul Maynard), two experienced former rail Ministers who set out why they welcome the integrated rail plan while perhaps hoping that it had gone further in some areas. I completely agree with every word of both of their speeches.

    One area of the IRP that I really welcome is the continued commitment to the £137 million upgrade to the Hope Valley line running between Manchester and Sheffield. That is important for several reasons. First, the line is one of the worst performing in the country in terms of reliability and punctuality, so this extra capacity to improve reliability and frequency and help freight get out of the quarries and into market is a really positive step, along with, finally, the retirement of the Pacers and their replacement by the new class 195 trains, and the much-needed reforms to rail franchising. That £137 million investment in our railways, combined with the £228 million new Mottram bypass and Glossop spur road, which is due to start construction in 2023, represents the biggest investment in transport infrastructure in the High Peak in my lifetime at least.

    On top of that, it is important to ensure that local passengers on the stopping stations on the Hope Valley line, such as Hope, Edale, Bamford, New Mills and Chinley, also benefit from this, and that we link up the bus services from those stations to destinations. That is why the Hope Valley explorer bus pilot is such a positive step forward. I also welcome the commitment to look at electrification of the line.

    I also want to talk about HS2, which benefits the High Peak directly. I am very pleased that the western leg and extension is going ahead. That will free up capacity on the Stockport corridor of the west coast main line through to Manchester Piccadilly, a big bonus for those travelling there from places including Buxton, Whaley Bridge, Chapel-en-le-Frith and New Mills.

    However, we do need to go further. That is why I continue to campaign for a railway station for Gamesley, one of the most deprived places in the country. It has one of the lowest car ownership rates but atrocious transport links, including a bus service that ends at 5 o’clock in the evening. That desperately needs sorting out. We also need to replace the loss of the 236 bus, which means that at the moment people in Glossop have no connection and no direct bus route through to Tameside Hospital and Ashton College. I really hope that gets fixed too.

    Overall, there are lots of really positive things in the integrated rail plan for us to welcome. I would like to see it go further in other places, but the key now is that we get on and deliver it, and that we get spades in the ground as soon as possible. I look forward to the start of the construction of the upgrade to the Hope Valley line within the next few months.

  • Tom Pursglove – 2021 Statement on Right to Work Policy for Asylum Seekers

    Tom Pursglove – 2021 Statement on Right to Work Policy for Asylum Seekers

    The statement made by Tom Pursglove, the Parliamentary Under-Secretary of State for Justice, in the House of Commons on 8 December 2021.

    Following the October 2018 publication of the Lift the Ban coalition’s report into asylum seeker right to work policy, which concluded that amending the policy could generate £42 million per year for the Government, the former Home Secretary, my right hon. Friend the Member for Bromsgrove (Sajid Javid), committed to a review. Today I would like to announce the findings of that review.

    For clarity, current asylum seeker right to work policy allows asylum seekers to apply for permission to work if a decision on their asylum claim has been outstanding for 12 months or more, where the delay is no fault of their own. If granted permission to work, asylum seekers may then apply for jobs on the shortage occupation list.

    Lift the Ban’s report recommended relaxing policy to allow asylum seekers to work after six months, with no restrictions on access to the labour market such as limiting eligible jobs to the shortage occupation list. In July 2020, a follow-up to their 2018 report was published with the same policy recommendation but with updated estimated benefits to the Government of £98 million per year. A further update in summer 2021 revised this further upwards to £180.8 million per year.

    The Home Office has carried out a comprehensive review of the Lift the Ban report; however, our evidence indicates the assumptions underpinning the recommendations are highly optimistic. Having considered a wide range of available evidence the Home Office believes that a more realistic set of assumptions would present a more nuanced picture. In particular, the Home Office believes that a more realistic set of assumptions would consider the following:

    demographic characteristics (such as family groupings and likelihood of care responsibilities impacting access to the labour market)

    how employment rates for migrant groups tend to increase gradually over time

    the propensity for part-time employment

    the likelihood that any employment is more likely to be close to the minimum or living wage rather than the UK median wage.

    In addition, a significant proportion of the fiscal benefits calculated by Lift the Ban are predicated on an assumption that once asylum seekers are granted access to the workforce they will no longer require financial support. The Home Office believes that given the likelihood for part-time and insecure employment this benefit is unlikely to fully materialise. This is because it expects that the administrative cost associated with moving asylum seekers on and off support as they cycle through periods of employment and support will be substantial.

    The Home Office has therefore concluded that the fiscal benefits arising from a relaxation of the right to work policy are likely to be significantly lower than the figures claimed by Lift the Ban. In light of wider priorities to fix the broken asylum system, reduce pull factors to the UK, and ensure our policies do not encourage people to undercut the resident labour force, we are retaining our asylum seeker right to work policy with no further changes.

    It is key this policy continues to protect our immigration system from those lodging unfounded asylum claims in an attempt to avoid work visa rules, particularly at a time when dangerous journeys made by small boat are increasing.

    Ultimately we must ensure asylum claims are considered without unnecessary delay. Our resources are therefore better deployed to pursuing an ongoing programme of transformation and system improvement initiatives that will speed up decision making, reducing the time individuals spend in the system awaiting an interview or decision.

    We recognise there are extraordinary circumstances affecting certain parts of the labour market at present. In response to these, we are offering time-limited visas to 4,700 HGV drivers in the food supply chain, 5,500 poultry workers, and 800 butchers to ease supply chain pressures this year. We will look at how the sectors concerned make use of these routes which were created in response to their requests.

    The Government continue to support industries in solving such issues in the long term through making roles more attractive to UK workers, with better pay and working conditions.

  • Julia Lopez – 2021 Statement on Telecoms Diversification

    Julia Lopez – 2021 Statement on Telecoms Diversification

    The statement made by Julia Lopez, the Minister for Media, Data and Digital Infrastructure, in the House of Commons on 8 December 2021.

    I would like to update the House on a package of measures and policy interventions we are announcing today to progress the Government’s 5G diversification strategy and the recommendations of the telecoms supply chain diversification taskforce.

    Following a 5G diversification taskforce recommendation, the Government have worked closely with industry to confirm a date by which 2G and 3G networks will be switched off. The Government can now confirm that the mobile network operators do not intend to offer 2G and 3G mobile networks past 2033 at the latest. The Government welcome that some individual operators will switch off their networks, particularly their 3G networks, earlier than this date, and will announce their own plans about when and how they intend to do this. The Government welcome the responsible switching off of these networks, and will continue to work with network operators to ensure a smooth transition that meets the needs of business users and consumers, including vulnerable groups.

    The Government are also announcing, together with UK mobile network operators, a joint ambition for 35% of the UK’s mobile network traffic to be carried over open and interoperable radio access network (RAN) architectures by 2030. The RAN is the part of the network that communicates directly with our devices, typically visible in the radio masts we see across the UK. Most networks today are characterised by closed “black boxes” in which all of the components are highly integrated and provided by a single, highly scaled vendor. “Opening” the RAN seeks to disaggregate these components and functions, lowering barriers to entry and promoting innovation. The Government welcome the steps taken by operators and suppliers to position the UK as a leader in the development of open and interoperable RAN technology and are pleased to commit £250 million of investment to support and accelerate this programme of work.

    As part of this work to promote interoperable RAN, the Government will be providing just over £36 million of investment to fund projects that span key technology challenges to Open RAN adoption as part of the Future RAN Competition (FRANC). This investment will also support industry, academia and local authorities across the UK to realise the benefits of high-speed networks and create new commercial opportunities. Finally, the Government are investing a further £15 million in the SmartRAN Open Networks Interoperability Centre (SONIC Labs) to expand it into a fully-fledged interoperability testing facility that will break down barriers and support industry in developing interoperable solutions. This investment will enable the lab to expand its programme of interoperability testing and international engagement. These projects will be subject to final grant funding agreement.

    The interventions demonstrate the Government’s commitment to delivering their diversification strategy and building lasting and sustainable supply for the infrastructure that underpins our entire digital economy. The Government will continue to update the House as this work progresses. Full details of the announcement will be published on www.gov.uk today.

  • Boris Johnson – 2021 Press Conference on Covid-19

    Boris Johnson – 2021 Press Conference on Covid-19

    The press conference held by Boris Johnson, the Prime Minister, at Downing Street on 8 December 2021.

    As soon as we learned of the new Omicron variant,

    this government acted

    introducing targeted and proportionate measures as a precaution, whilst our scientists discovered more.

    And we’re learning more every day.

    We do not yet know Omicron’s severity, its exact rate of transmission,

    nor indeed the full effectiveness of our vaccines against it.

    But since I last spoke to you, it’s become increasingly clear that Omicron is growing much faster than the previous Delta variant,

    and it’s spreading rapidly all around the world.

    568 cases have been confirmed through genomic sequencing across every region of the UK,

    and the true number is certain to be much higher.

    Most worryingly, there is evidence that the doubling time of Omicron in the UK could currently be between two and three days.

    And while there are some limits to what we can learn from South Africa,

    Because of the different rates of vaccination and different rates of previous infection –

    we are seeing growth in cases here in the UK that mirrors the rapid increases previously seen in South Africa.

    And South Africa is also seeing hospitalisations roughly doubling in a week,

    meaning that we can’t yet assume Omicron is less severe than previous variants.

    So while the picture may get better,

    and I sincerely hope that it will –

    we know the remorseless logic of exponential growth could lead to a big rise in hospitalisations, and therefore sadly in deaths.

    And that is why it is now the proportionate and responsible thing to move to Plan B in England

    while continuing to work closely with our colleagues in the Devolved Administrations –

    so we slow the spread of the virus,

    buy ourselves the time to get yet more boosters into more arms, and especially in the older and more vulnerable people,

    and understand the answers to the key outstanding questions about Omicron.

    So first, we will reintroduce the guidance to work from home.

    Employers should use the rest of this week to discuss working arrangements with their employees

    but from Monday you should work from home if you can. Go to work if you must but work from home if you can.

    And I know this will be hard for many people, but by reducing your contacts in the workplace you will help slow transmission.

    Second, from this Friday we will further extend the legal requirement to wear a face mask to most public indoor venues, including theatres and cinemas.

    There will be of course exemptions where it is not practical, such as when eating, drinking, exercising or singing.

    Third, we’ll also make the NHS Covid Pass mandatory for entry into nightclubs, and venues where large crowds gather

    including unseated indoor venues with more than 500 people,

    unseated outdoor venues with more than 4,000 people

    and any venue with more than 10,000 people.

    The NHS Covid Pass can still be obtained with two doses but we will keep this under review as the boosters roll out.

    And having taken clinical advice since the emergence of Omicron, a negative lateral flow test will also be sufficient.

    As we set out in Plan B, we will give businesses a week’s notice, so this will come into force in a week’s time,

    helping to keep these events and venues open at full capacity,

    while giving everyone who attends them confidence that those around them have done the responsible thing to minimise risk to others.

    As Omicron spreads in the community, we will also introduce daily tests for contacts instead of isolation,

    so we keep people safe while minimising the disruption to daily life.

    And of course we will take every step to ensure our NHS is ready for the challenges ahead.

    But the single biggest thing that every one of us can do,

    is to get our jabs

    and crucially to get that booster as soon as our turn arrives.

    One year to the day since the UK became the first country in the world to administer a Covid vaccine into the arms of Margaret Keenan,

    we have opened up the vaccine booster to all those over 40,

    and we are reducing the gap between second dose and booster to a minimum of just three months.

    Our heroic NHS staff and volunteers have already done almost 21 million boosters,

    including reaching 84 per cent of all the eligible over 80s.

    But we need to go further and faster still,

    because our scientists are absolutely confident that your immune response will be stronger if you have been boosted.

    And while you are at it – please get your flu jab too.

    Let’s do everything we can to protect ourselves and our loved ones this winter – and to reduce the pressures on our NHS.

    As we learn more, so we will be guided by the hard medical data around four key criteria:

    the efficacy of our vaccines and our boosters,

    the severity of Omicron,

    the speed of its spread,

    and the rate of hospitalisations.

    We will constantly monitor the data and keep it under review.

    And of course we must be humble in the face of this virus

    But if and indeed as soon as it becomes clear that the boosters are capable of holding this Omicron variant,

    and we have boosted enough people to do that job

    then we will be able to move forward as before.

    So please everybody play your part – and get boosted.