The below Parliamentary question was asked by Helen Hayes on 2016-05-18.

To ask the Secretary of State for Energy and Climate Change, how much domestic solar PV by MWp was deployed in Quarter 1 of the new FIT scheme; and what the cap was for that quarter.

Andrea Leadsom

Domestic solar PV (typically greater than 4kW) is included within the greater than 10kW solar PV cap. In quarter one of 2016, the deployment cap for solar PV greater than 10kW was set at 48.4 MW and 21.031 MW of capacity was deployed. Unutilised capacity was rolled over to the next quarter’s cap.