Blog

  • Callum McCaig – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Callum McCaig – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Callum McCaig on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, what estimates her Department has made of the amount of carbon dioxide displaced as a result of the introduction of the (a) domestic and (b) non-domestic Renewable Heat Incentive.

    Andrea Leadsom

    The Department has made projections of carbon dioxide savings (MtCO2) from the domestic and non-domestic Renewable Heat Incentive scheme in the Updated Energy & Emissions Projections (EEP), last updated Sept 2014. In the absence of funding arrangements after 2015/16, these carbon savings assume an extrapolation of RHI deployment to 2020.

    The projected savings will be updated if required for any RHI scheme changes following the Spending Review outcome.

    The EEP, which include the relevant carbon saving projections from the RHI, are available at:

    https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/406805/Copy_of_Annex_D__corrected_17-Feb-2015_.xls.

  • Callum McCaig – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Callum McCaig – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Callum McCaig on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, what estimate her Department has made of the installed capacity required to meet the Government’s 2020 renewable heat target in each year from 2015 to 2020.

    Andrea Leadsom

    The Government does not have a renewable heat target for 2020, but by that year the UK is required to obtain 15% of its final energy consumption from renewable sources under the EU Renewable Energy Directive. This includes renewable heating, where the level of renewables has more than doubled since 2012/13 to reach 4.9% in 2014.

    Progress towards the overall target is monitored via interim milestones. The UK is continuing to make progress; and we are set to meet the next interim target, which is an average of final energy consumption over 2013/14. The provisional figure, released on 25 June, showed 6.3% of final energy consumption for 2013/14 came from renewable sources, against a target level of 5.4%.

  • Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Flynn on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, pursuant to her Written Statement of 21 October 2015, HCWS 257, on energy investments, how many waste transfer contract documents for Hinkley Point C have been agreed; where such contract documents are being published; and how many such documents will be withheld for reasons of commercial confidentiality.

    Andrea Leadsom

    Two waste transfer contracts are proposed (but have not yet been entered into) for Hinkley Point C, one for intermediate level waste and one for spent fuel. In line with the published Waste Transfer Pricing Methodology, we would expect to publish as much of the waste transfer contracts as possible, except for material of a sensitive nature, if the Secretary of State decides to enter into the Contract for Difference and the waste transfer contracts are signed. We would expect to make these documents available on the www.gov.uk website.

  • Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Flynn on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, pursuant to her Written Statement of 21 October 2015, HCWS 257, on energy investments, what the evidential basis is for her judgement that the waste transfer contract liabilities are likely to be very low.

    Andrea Leadsom

    The basis on which my rt. hon. Friend the Secretary of State considers the likelihood of the potential waste transfer contract liabilities arising to be very low is set out in the Departmental Minute laid before Parliament alongside the Written Statement on 21 October, which for ease of reference is annexed.

  • Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Flynn on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, what the risk premium negotiated with EDF energy for the waste transfer contracts covering radioactive waste from Hinkley Point C is; and what advisers her Department appointed to assist in those negotiations.

    Andrea Leadsom

    The waste transfer contracts for the Hinkley Point C power station have been prepared in line with the approach set out in the Waste Transfer Pricing Methodology published in 2011.

    As set out in the methodology, the contracts provide for the setting of a Waste Transfer Price for the provision of a waste disposal service. The Waste Transfer Price will be set at a level over and above estimated costs and include a risk premium to compensate the taxpayer for taking on the risk of subsequent cost escalation.

    In line with the methodology, the contracts provide that the Waste Transfer Price, and hence the risk premium, is not set at the outset but instead is deferred for a specified Deferral Period to enable greater certainty over expected costs. Therefore the waste transfer contracts for Hinkley Point C do not specify a risk premium. Rather, the contracts set out how the Waste Transfer Price, and hence the risk premium, will be determined at the end of the Deferral Period and the approach in the contracts is in line with the published methodology.

    DECC appointed Slaughter and May to provide legal advice in the negotiations on the waste transfer contracts for Hinkley Point C.

  • Diana Johnson – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Diana Johnson – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Diana Johnson on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, pursuant to the Answer of 2 November 2015 to Question 13491, if she will make it her policy to designate all the areas supplying aquifers used for drinking water as Source Protection Zones 1.

    Andrea Leadsom

    Source Protection Zones identify the area of an aquifer that provides the water abstracted at the drinking water supply borehole. Source Protection Zones 1 (SPZ1) are the area within which pollution would take less than 50 days to reach an abstraction point and where the consequences of groundwater pollution would therefore be greatest. They are used by the Environment Agency as a tool for regulation. The Environment Agency will not permit drilling for oil or gas in an SPZ1. Outside SPZ1s the Environment Agency will require a site specific risk assessment and will only permit drilling for oil or gas if it is satisfied that there is no significant risk to supplies of drinking water and no unacceptable impact on groundwater.

  • Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Paul Flynn – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Flynn on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, what steps her Department has taken to promote Energy Efficiency Week; how her Department has worked with non-governmental organisations on such initiatives; and what the cost to the public purse was of those initiatives.

    Andrea Leadsom

    Big Energy Saving Week is a Great Britain wide consumer awareness raising campaign run ahead of winter in partnership with respected partner organisations Citizens Advice and the Energy Saving Trust (EST), with around £300,000 funding provided by DECC.

    The campaign was delivered 26-30 October 2015 and focussed on supporting consumers to understand how they can save money by switching tariff, supplier and payment method and improving energy efficiency, through hundreds of face to face outreach events run by Citizens Advice offices and a national, regional and social media campaign delivered by EST.

    The last campaign in October 2014 was a big success with over 500 events nationwide reaching an estimated 100,000 consumers face to face or through dedicated helplines with many millions more reached through a complementary media campaign.

  • Andrew Rosindell – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Andrew Rosindell – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Andrew Rosindell on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, what the contractual status is of the China/EDF deals; whether those contracts make provision for their terms to be reassessed at a future date; and if she will make a statement.

    Andrea Leadsom

    The agreements announced on 21 October between EdF and CGN show the commitment of all sides to the Project – EDF has confirmed it will take a 66.5% stake in Hinkley with China General Nuclear (CGN) taking 33.5 per cent, demonstrating a clear commitment from both parties. The Government and EDF have finalised the Contract for Difference and ancillary documentation which offers increased price certainty for the electricity produced from Hinkley Point C. The Funded Decommissioning Programme has been approved and will make sure that the tax payer doesn’t pick up the cost of decommissioning the plant in the future. My rt. hon. Friend the Secretary of State will take her final decision on the Contract for Difference when EDF and CGN have signed the full investment documentation. I refer the hon. Member to the Written Ministerial Statement made by the Secretary of State on 21 October, Official Report, Column 45WS:

    http://www.publications.parliament.uk/pa/cm201516/cmhansrd/cm151021/wmstext/151021m0001.htm#15102155000002.

  • Andrew Rosindell – 2015 Parliamentary Question to the Department for Energy and Climate Change

    Andrew Rosindell – 2015 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Andrew Rosindell on 2015-11-02.

    To ask the Secretary of State for Energy and Climate Change, what the agreed terms and retail price (a) with and (b) without an RPI-annual refix are of the recently announced China/EDF deals.

    Andrea Leadsom

    The Contract for Difference for Hinkley Point C if entered into in its final form would provide an initial strike price of £92.50/MWh, or if Sizewell goes ahead it will be reduced to £89.50/MWh, both in 2012 prices and fully indexed to the Consumer Price Index (not RPI). My rt. hon. Friend the Secretary of State expects to be in a position to take her final decision on the Contract for Difference and associated agreements for Hinkley Point C once the documentation relating to equity investment into the project is finalised.

  • Phillip Lee – 2015 Parliamentary Question to the Department for Education

    Phillip Lee – 2015 Parliamentary Question to the Department for Education

    The below Parliamentary question was asked by Phillip Lee on 2015-11-02.

    To ask the Secretary of State for Education, what assessment her Department has made of the effects of open-plan teaching facilities on pupils’ learning; and what provision is available to assist schools with conversion of facilities from an open-plan layout where that layout is shown to be having a detrimental effect on learning.

    Edward Timpson

    The Department has not made any formal assessment of the overall effects of open-plan teaching facilities on pupil’s learning.

    On 9 February 2015 the government announced £4.2bn of allocations to schools, local authorities, academy trusts and voluntary aided partners to fund the improvement and maintenance of our schools. This includes £1.4bn in 2015-16.

    While we would expect this money to be spent first on making sure that existing school buildings are in good condition, it is for these bodies to decide how to prioritise the funding, according to local needs.

    In 2015-16, the Department spent £8 million on improvements to large open teaching areas in academies which had been built under the Building Schools for the Future programme, where independent evidence suggested this was having a detrimental effect on good teaching and learning.