Category: Transportation

  • Grant Shapps – 2022 Statement on the European Train Control System

    Grant Shapps – 2022 Statement on the European Train Control System

    The statement made by Grant Shapps, the Secretary of State for Transport, in the House of Commons on 29 June 2022.

    I am pleased to announce over £1billion investment in the East Coast Digital Programme, which aims to introduce the European Train Control System (ETCS) to the Southern section of the East Coast Mainline.

    European Train Control System, also known as digital signalling, brings signalling onto a screen in the train’s cab. This provides drivers with continuous real time information, for example maximum allowable speeds, and removes the need for line-side signals. Trackside sensors are retained to track the train on the network and support adaptive decision making, through assessing and understanding that particular train’s characteristics such as speed and braking distance. This investment will fund the fitment of trains and lineside technology on the stretch of line from London King’s Cross to Stoke Tunnel, just North of Peterborough, as well as the integration of this technology into the network and its operating companies.

    This will be the first deployment of European Train Control System on a mixed-use mainline in the UK rail network, increasing punctuality and reliability for both passenger and freight services across the whole line. Trains will be able to run closer together safely, enabling more services to run on the same stretch of track. Fewer signalling failures and faster recovery from any delays will make the service more reliable for the customer.

    This programme of work presents a unique opportunity to enable a positive step-change in technology on the network, with a move away from systems of signalling that emerged from Victorian times, and towards a high-performing digital alternative. As the rail sector continues to recover from the pandemic, it is vitally important that capacity and reliability are both increased in a financially viable way as demand returns.

    This large upfront investment in the rail sector also presents an opportunity for savings in the long run, as maintenance of these assets is more affordable across the whole life of the signals. Furthermore, this programme will create approximately 5,000 highly skilled jobs in the rail industry.

    Initial enabler projects have already begun, including the fitment of trains and some infrastructure on the Northern City Line, with works to continue through the 2020s.

    This major investment is symbolic of this Government’s ongoing commitment to modernising our railways, making them fit for the 21st century. Deployment of this innovative technology for the first time on a mixed-use mainline in the UK will deliver improvements for the user, support the creation of a financially sustainable railway and also grow and level up the economy by delivering an upgrade to this vital economic artery which stretches along the spine of this country.

  • Grant Shapps – 2022 Statement on the Road Safety Investigation Branch

    Grant Shapps – 2022 Statement on the Road Safety Investigation Branch

    The statement made by Grant Shapps, the Secretary of State for Transport, in the House of Commons on 29 June 2022.

    I wish to inform the House that my Department has today published its response to the Government consultation on establishing a Road Collision Investigation Branch.

    This Government are committed to improving road safety and reducing the number of people who are killed or seriously injured on our roads each year. I am pleased to announce that the Government intend to bring forward new measures to enable the creation of the branch, which, following discussions with stakeholders, will be named the Road Safety Investigation Branch.

    This independent, safety-focused branch will learn the lessons from road collisions and other incidents, including those involving self-driving vehicles, by carrying out independent investigations and making recommendations to prevent future incidents, make our roads even safer and save lives across the country. The branch will also provide vital insight into safety trends related to new and evolving technologies, which will help to ensure road safety policy keeps pace with new developments.

    We expect to include measures to enable creation of the branch in the forthcoming Transport Bill.

  • Trudy Harrison – 2022 Speech on Hammersmith Bridge

    Trudy Harrison – 2022 Speech on Hammersmith Bridge

    The speech made by Trudy Harrison, the Parliamentary Under-Secretary of State for Transport, in the House of Commons on 28 June 2022.

    I congratulate the hon. Member for Putney (Fleur Anderson) on championing Hammersmith bridge once again, and on securing the debate. I also note the contributions by the hon. Members for Hammersmith (Andy Slaughter), and for Richmond Park (Sarah Olney). I have listened carefully to them, and I appreciate that the subject is of keen interest to their constituents. I understand the impact of the bridge’s closure to motor vehicles on many of the people in constituencies around Putney, and throughout south and west London.

    As the hon. Member for Putney is aware, the bridge is owned by the London Borough of Hammersmith and Fulham and, as such, the borough has the responsibility for maintaining the bridge. The decisions on its repair lie with the borough. The bridge is a unique wrought iron structure, and has served generations of Londoners for nearly 200 years. It is deeply concerning that the bridge has had to close, first to motor vehicles in 2019 and then to all users in 2020. Of course the safety of those using the bridge was and remains the greatest priority. That is why my Department has done everything in its power to assist the London Borough of Hammersmith and Fulham and Transport for London with the project, and to facilitate the full reopening of the bridge to all users, including motor vehicles.

    I turn to the progress that has been made and some of ways that we have assisted. In 2019, we established the Hammersmith bridge taskforce, led by Baroness Vere of Norbiton, and it has met several times. The taskforce brings together all the key stakeholders whose input is required to deliver successful outcomes for pedestrians, cyclists, river traffic, and, eventually, motorists. The taskforce has been instrumental in organising stakeholders to work together in developing a clear course of action to enable the bridge to open.

    The hon. Member for Richmond Park (Sarah Olney) asked about the prior information notice that was issued by Hammersmith and Fulham. That PIN was issued on 25 May, with a deadline of 10 June. It was then extended to 15 June. Meetings with interested parties are taking place over the next few weeks to gauge interest and to seek feedback on the proposals. This is a crucial step in the process, and in developing an understanding of the market’s appetite and of the options being considered by the London Borough of Hammersmith and Fulham.

    On the timelines, since the establishment of the Hammersmith bridge taskforce, the project has made significant progress. Thanks to Government funding—some £4 million was provided on 31 October 2020—the bridge was able to reopen on 17 July 2021, albeit on a limited and controlled basis, to pedestrians, cyclists and river traffic. The next stage of the project—reopening the bridge to motor vehicles—is under development by the London Borough of Hammersmith and Fulham. Providing a schedule for full reopening is part of the development process. Whether to impose tolls is a decision for the London Borough of Hammersmith and Fulham. We expect the borough to engage with residents as it deems appropriate, so that it can understand any implications, as the hon. Member for Richmond Park set out.

    Sarah Olney

    Can the Minister bring any influence to bear on her colleague in the other place, Baroness Vere, so that she reconvenes a taskforce that will enable the whole issue of tolls to be properly, widely and publicly discussed with the relevant stakeholders?

    Trudy Harrison

    I will now set out exactly what is happening. Much good progress is being made. Following the complete closure of the bridge in 2020, the Department for Transport provided £4 million of taxpayers’ money, which enabled a comprehensive investigation of the overall structure and condition of the bridge. Through that investment, we had pretty much world-leading engineers working to develop a complete picture of the issues facing the bridge. Those works determined that the bridge was in a better condition, thankfully, than first thought, and that led directly to the bridge reopening, albeit on a temporary and controlled basis to pedestrians, cyclists and river traffic.

    Andy Slaughter

    I am in a state of despair, listening to the Minister. The cost of reopening this bridge could be £160 million. Hopefully, it will be less, but it is of that order. It is about the same as building a whole new Thames bridge, and it is fantasy for the Minister to say, “The Government are providing £4 million,” and “The Government have done this or that.” All the initiative so far has been taken by Hammersmith and Fulham Council—whether that is on the memorandum of understanding, on the proposals for the cheaper Foster COWI bridge, or on the stabilisation work—to get the bridge open permanently again to pedestrians. This is a strategic route through London. The Government must step up to the plate. I know that this is not in the Minister’s brief, but please could she take this issue seriously? It is affecting hundreds of thousands of people all across London and the south-east.

    Trudy Harrison

    I reject the characterisation of my Department as not taking this seriously. The hon. Gentleman will know that when one is potentially spending more than £100 million on a new bridge, much consideration and engineering knowledge will need to go into things such as a review by the Case for Continued Safe Operation Board. The board monitors the condition of the bridge, and has enabled it to stay open to pedestrians, cyclists and river traffic. I am relieved to say that since that reopening, no further closures on safety grounds have been necessary.

    The commitment to this project did not stop at the initial £4 million investment—not at all. In the TfL extraordinary funding and financing settlement of June 2021, we committed to sharing the cost of reopening the bridge. We have committed to that funding with the London Borough of Hammersmith and Fulham and TfL. We reiterated that commitment in a subsequent settlement, agreed in February 2022. That commitment ensures that the Government will fund up to one third of the cost of opening the bridge to pedestrians, cyclists, river traffic and—depending on those costs—buses and motor vehicles as well.

    The first part of that commitment has already been delivered. Earlier this year, the Department approved the full business case from LBHF for the stabilisation works on the bridge. Those works will ensure that the bridge will remain open to pedestrians, cyclists, and river traffic permanently, with no risk of further temporary closures due to unsafe conditions.

    The approval of the business case was a condition of the Government’s releasing their third of the funding for stabilisation. I am pleased to say that in May this year, my Department provided the borough with almost £3 million to allow the works to progress unimpeded by financial concerns. That brings the total investment to date to nearly £7 million.

    It is thanks to the excellent work and diligence of my Department, TfL and the London Borough of Hammersmith and Fulham that the works are already well under way. At long last, the residents of this part of London can see tangible progress being made. The borough is now managing the works, and will be providing my Department with regular updates on progress.

    The next stage is to strengthen the core and renovate other structurally significant parts of the bridge. The strengthening phase of engineering works will build on stabilisation works; on its completion, the bridge can open to all users, including buses and motor vehicles. LBHF is required to submit a further business case to my Department and to TfL; in that business case, we would expect to see that the proposed method of strengthening is viable, offers value for money and minimises disruption to current users of the bridge. That is essential. The business case will also set out the final cost estimate for strengthening the bridge and, once approved, will allow my Department to release its third of the funding.

    Fleur Anderson rose—

    Trudy Harrison

    Sorry; unfortunately, I cannot give way due to time. All three parties will work together over the coming months to ensure that an HM Treasury Green Book-compliant business case is developed and submitted for approval as soon as possible.

    In closing, I re-emphasise that reopening Hammersmith Bridge to all users is and remains a Government priority. Restoring full access to this vital south-west London artery will improve the lives of thousands of residents, commuters and businesses who have, as we have heard this evening, been long deprived of a convenient route across the Thames. I also restate my Department’s commitment to funding up to one third of the cost, on approval of an appropriate business case.

    I thank hon. Members for their contributions, and for their dedication in highlighting the issues that the continued closure of the bridge causes for their constituencies and others in the surrounding area. I reassure them that we are working tirelessly to deliver the full opening of the bridge.

  • Fleur Anderson – 2022 Speech on Hammersmith Bridge

    Fleur Anderson – 2022 Speech on Hammersmith Bridge

    The speech made by Fleur Anderson, the Labour MP for Putney, in the House of Commons on 28 June 2022.

    Thank you for calling me, Mr Deputy Speaker, and I thank the Members who are present for this important Adjournment debate.

    Here I am again, and talking about Hammersmith bridge again. It has been closed to vehicles for three long years, and that closure is still having a huge impact on the everyday lives of residents in Putney, Roehampton and Southfields, and much more widely across south-west London.

    I last held an Adjournment debate on the closure—and, hopefully, the reopening one day—of the bridge in April 2021, and I have raised it in the House several times since then. Since that debate there have been welcome stabilisation works to make the bridge safer, and it has reopened to pedestrians above and river traffic below. However, I am here again because there has still been no agreement on the building of a temporary vehicle bridge, on any date by which the restoration of the bridge will be complete, or on when—and residents are crying out “When?”—the bridge will fully reopen. I hope to hear much better news from the Minister this time than last time, and I know that plenty of people in Putney and across south-west London are listening to the debate and also want those answers.

    The Government have been dragging their feet, and the taskforce has had no task and no force. Responding to my last debate, the then Parliamentary Under-Secretary of State for Transport, the hon. Member for Redditch (Rachel Maclean), simply said:

    “The buck stops with Hammersmith and Fulham.”—[Official Report, 14 April 2021; Vol. 692, c. 442.]

    That was a very disappointing end to the debate. I will be describing all that Hammersmith and Fulham Council is doing now, because it is the council that is responsible for the bridge, and explaining why it is the Government who need to do more.

    It is Hammersmith and Fulham Council that made the assessment of the danger in the first place, has made the business case for the stabilisation works and funded those works up front, and has drawn up the memorandum of understanding between the council, the Government and Transport for London, the three parties that will be responsible for the funding. However, Transport for London does not have the funds to restore the bridge because of reduced fees and other payments as a result of covid, so it comes down to the Government. What have the Government done, what will the Government do, and when will the bridge reopen?

    Let me first say something about the impact of the closure. It has resulted in between 500 and 4,000 vehicles a day coming through Putney High Street. Local residents complain constantly of increased travel times for journeys by bus and car, of increased congestion and pollution and of accidents on the roads, especially involving children near the schools on the most affected roads.

    We want more safe cycle routes in Putney, and in Wandsworth we have one of the highest “propensity to cycle” ratings. However, the increased traffic and traffic jams make cycling more dangerous and put people off cycling. In meetings that I have held with potential cyclists, most people say they feel that Putney Hill, Putney High Street and Putney Bridge are very dangerous roads. That in turn means worse air quality, because if there are fewer cyclists on the road there are more vehicles, which add to the congestion. As you will know, Mr Deputy Speaker, each year more than 4,000 Londoners die prematurely as a result of air pollution, and more than 500,000 people in London boroughs suffer from asthma and are vulnerable to toxic air.

    Recently, for Clean Air Day, I undertook readings using an ultra-fine particle counter—lent to me by Imperial College—along Putney High Street and the Lower and Upper Richmond Roads, the main diversion routes from the bridge. The readings were exceptionally high, even from inside homes along those roads. Residents have shown me the black soot that builds up in their homes, and companies tell me about the impact that the poor air quality is having on their business.

    The Putney Society is concerned about this as well, and it has sent me the following statement about the impact of the bridge closure:

    “Congestion is at an all time high with roads leading towards Putney Bridge clogged up before 7 am in the morning, with traffic jams continuing well into the evening. Prior to the Bridge closure in 2019 Putney already suffered from one of the most polluted High Streets in the country. And despite positive measures such as the introduction of cleaner buses and the ULEZ zone, our pollution levels continue to exceed UK legal limits, in part because of additional traffic resulting from the Bridge closure. Around 60 constituents die prematurely each year because of this pollution, and we now face the prospect of this continuing for several more years until Hammersmith Bridge is fully repaired.”

    The statement continues:

    “The extra traffic has affected thousands of people. Aside from the impact of pollution on residents’ health, children and students have suffered disrupted journeys to their school or college; workers, especially those travelling from Roehampton, have faced significantly lengthened bus journeys and businesses have had delayed deliveries. And the most vulnerable people, who require access to healthcare, whether appointments or vital emergency treatment, face delays in getting an ambulance or reaching nearby hospitals. Why? Because ambulances can no longer take a short hop across the Bridge to Barnes or beyond but now spend much, much longer in traffic”.

    Andy Slaughter (Hammersmith) (Lab)

    My hon. Friend is making an excellent speech, particularly in drawing attention to the fact that the closure of Hammersmith bridge is having a sub-regional and regional effect. It is much wider than just the immediate locality. Does she find it surprising that the Government have dragged their feet all the way along the line on this, first by asking Hammersmith to find all the funding, then £64 million and now a third of the cost, which is more than double what they would propose for similar schemes? Does she agree that until the Government are prepared to take their responsibilities in this matter seriously, we are not going to see progress?

    Fleur Anderson

    I absolutely agree with my hon. Friend. We have just had a debate on Government failure, and this is Government failure 101. Not keeping a major transport route open in our capital city and letting it stay closed for so many years—and who knows how much longer—is a Government failure. They need to step up with the funding, and I will be outlining more information about that.

    Hammersmith bridge is a very unusual bridge, and this is why it requires special attention from the Government. It is a grade II listed structure and part of Great Britain’s engineering heritage. It is also one of the world’s oldest suspension bridges, and only five years younger than the Brooklyn bridge in New York. It is unique, having been built out of cast iron, wrought iron and wood. No Government, surely, would allow the Brooklyn bridge to stay closed, so why let Hammersmith bridge do so? It has suffered from over seven decades of deterioration and corrosion. This corrosion, along with the fact that the bridge was designed for the needs of the 19th century, is what makes Hammersmith bridge one of the most expensive bridges in Britain to repair. When warnings of its possible imminent collapse forced its closure, I perfectly understood that the engineers faced huge challenges.

    Transport for London has estimated that the repair bill could be between £141 million and £161 million. By comparison, the cost of repairing other Thames bridges is far smaller. For example, Chiswick bridge cost £9 million to repair, and Albert bridge cost £9.7 million. In those cases, Transport for London largely funded the works, paying between 85% and 100% of the costs. The responsible council was not left to foot the bill in the way that Hammersmith and Fulham Council is being asked to do. The bridge is a special case, both historically and financially, and it needs a different funding package from the Government.

    Overall, there needs to be a change in bridge policy in London. Lambeth Council has five bridges, but is responsible for none of them. Southwark bridge and London bridge are managed by a trust. Two railway bridges are managed by Network Rail, but Hungerford railway bridge is managed by Westminster. The policy is all over the place. I think it might be time to look at the inequity of bridge responsibilities in London, because it is clear that the system is failing us over Hammersmith bridge. But we are where we are, and there is currently an agreement that the Government, Transport for London and Hammersmith and Fulham Council will fund it.

    The Mayor of London has repeatedly sought to meet the Transport Secretary to discuss this and a range of London transport funding issues, but these requests have all been refused. Twenty meetings with Transport for London have been cancelled by the Department for Transport or the Treasury since the last TfL funding deal was agreed. The last time the Transport Secretary and the Mayor of London spoke and discussed Transport for London funding was on 30 May 2021. That is shocking to hear, as Londoners are being let down by this Government. We need them to work with the Mayor, and I hope to hear more of that from the Minister later. We are talking about a national transport route, and the Government must lead the way in funding and reopening it. If a toll is going to be made necessary because the Government will not fund the bridge, has the impact on Putney residents been factored into that business case?

    What has Hammersmith and Fulham Council done? Can we say that the buck stops with it? Last November, the council submitted a full business case to the Department for Transport for the stabilisation works, at a cost of £8.9 million, which was £21 million less than the TfL stabilisation plan, so this is a major saving to the taxpayer. To speed up the repair programme, the council decided in December to make the cash available up front, rather than wait for the DFT and TfL governance processes to sign off their shares, as that process is simply too cumbersome. That enabled works to begin several months early. The DFT did not sign off on its one-third share until 22 March this year, many months later, showing that the Government are dragging their feet. The phase 1 stabilisation programme was able to get under way on site in February. It will stop the risk of collapse and prevent future closures to pedestrians, cyclists and river traffic, which I, of course, welcome. On 7 March, Hammersmith and Fulham Council signed off a further £3.5 million investment so that it could crack on with all the essential expert studies required to obtain Government and TfL funding through the full business case. That includes essential concept design work, geotechnical studies, crowd loading assessments and traffic modelling. I understand that the council and the DFT officials are working together on completing the business case, but when will that be done? Will funding be ready to go as soon as that is completed and approved, so that we do not have any more delays?

    The latest investment of £3.5 million by the council to deliver those essential studies has again been paid for by the council up front, rather than having to wait for the DFT and TfL governance processes to kick in. This signing off of money, at its own risk for the council, in order to expedite bridge works is a situation that the council says cannot continue. I understand that the impasse is now the memorandum of understanding, which would confirm the one shares payable for the council, the DFT and TfL, but that it has not been signed. The latest draft version was sent by the council to the DFT on 14 September 2021, but it has not yet received a response from Ministers or their officials. So I hope that I will not hear, “The buck stops with Hammersmith and Fulham Council” from the Minister again. The Government need to recognise the huge impact of this closure on people in Putney and beyond, and they need to take far more proactive and urgent action.

    I shall finish with some questions for the Minister. When is the next meeting of the taskforce? When will Secretary of State sign the memorandum of understanding to enable the next phase of the works to continue as fast as possible? What is the hold-up on that? Has an assessment of the impact of a proposed toll, or of any other financial proposals, on routes through Putney been carried out? Would the Government consider underwriting the full works? When will the building of the temporary bridge start? How long will it take? Is there a deadline from Ministers for the completion of this project, as we would certainly like to see that there is and that it is as soon as possible? I ask again, and I will keep asking, what have the Government done, what will they do and when will Hammersmith bridge reopen?

    Mr Deputy Speaker (Mr Nigel Evans)

    Sarah Olney has asked permission from the mover of the motion and the Minister to make a short contribution in this debate. Both have agreed and I have been informed.

    Sarah Olney (Richmond Park) (LD)

    Thank you very much, Mr Deputy Speaker. I thank the hon. Member for Putney (Fleur Anderson) for securing this debate and I thank the Minister and you for allowing me to contribute briefly to it. As I am sure everybody knows, the closure of Hammersmith bridge has had an enormous impact on my constituents. I wish to raise two issues, following on from the excellent speech of the hon. Member for Putney outlining the situation. The first is that on 25 May 2022, the London Borough of Hammersmith and Fulham issued a prior information notice, announcing its intention to seek external funding for its third of the cost of strengthening Hammersmith bridge. As the hon. Lady asked, does that mean tolls? We are desperately seeking further information on that important point from the Department. I am not against tolls. If they are required to get the bridge open, there may be public support for that in Richmond Park, but it needs detailed consideration by all parties, including the London Borough of Richmond upon Thames. Any tolls would weigh heavily on my residents, and we need a full exploration of all the factors. For instance, would tolls mean that people continue to use Putney and Chiswick bridges and avoid Hammersmith bridge and the tolls? Tolls are not unknown on London bridges, but not within the lifetime of anyone here.

    My residents would also want to know who will have to pay the tolls. Might there be exceptions for Richmond residents, or will the exceptions just be for buses and emergency vehicles? We need more information. I urge Baroness Vere, the Minister responsible, to reconvene the taskforce so that the issues can be urgently discussed by local stakeholders, including the London Borough of Richmond upon Thames.

    The hon. Member for Hammersmith (Andy Slaughter) made the point about the strategic issue involved. In Richmond, planning permission for housing developments, school place planning and healthcare planning are being affected. Will my residents have access in the long term to services, including schools and healthcare, on the north side of the Thames? It is really urgent. We know that jointly Transport for London, the Department for Transport and the London Borough of Hammersmith and Fulham are committed to reopening the bridge, but without the funding to do so, their commitment is not worth very much. When it comes to five and 10-year planning for education and healthcare, we do not know whether services on the north side of the Thames will be accessible to people in Barnes. That is a real issue for parents who are thinking about schooling for their children. Will they be able to cross the bridge and access schools in Hammersmith and further afield? I thank the hon. Lady for bringing the debate to the House, and you, Mr Deputy Speaker, for allowing me to contribute.

  • Grant Shapps – 2022 Statement on TFL Funding Extension

    Grant Shapps – 2022 Statement on TFL Funding Extension

    The statement made by Grant Shapps, the Secretary of State for Transport, in the House of Commons on 27 June 2022.

    Following my statement to the House on 25 February, I am updating the House on a short extension of the current Transport for London (TfL) funding settlement that was due to expire on 24 June 2022, by 19 days, to 13 July. This has been agreed by the Mayor of London.

    Since the start of the pandemic, we have supported the transport network in London with nearly £5 billion funding through extraordinary funding settlements for Transport for London. We have recognised the reliance of London’s transport network on fare revenue, and Government continue our commitment to mitigating loss of fare revenue because of the pandemic.

    This extension to the current funding settlement is necessary in part due to the unsatisfactory progress made by TfL on its conditions, including pensions. Resolving these issues is an integral part of setting TfL on the path to financial sustainability, and Government stand ready to engage constructively to reach a resolution. This extension ensures that they receive due attention, as well as allowing time for both sides to consider a longer-term capital settlement.

    Government are committed to supporting London’s transport network as we have since the start of the pandemic, and is in discussions with TfL on a longer-term settlement. By rolling over the provisions of the existing agreement, the extension provides continued support to Transport for London and certainty to Londoners while we work with Transport for London on their emergency funding needs.

    Support to Transport for London has always been on the condition that Transport for London reaches financial sustainability as soon as possible and with a target date of April 2023. Government continue to press the Mayor of London and Transport for London to take the decisions needed to put the organisation on a sustainable footing. I will update the House at my earliest opportunity on the details of any longer-term capital settlement.

  • Robert Courts – 2022 Comments on Funding to Support the Mental Wellbeing of Seafarers

    Robert Courts – 2022 Comments on Funding to Support the Mental Wellbeing of Seafarers

    The comments made by Robert Courts, the Maritime Minister, on 23 June 2022.

    Seafarer wellbeing is at the heart of our Maritime 2050 agenda and we know that mental health difficulties at sea affect thousands of seafarers. We are committed to tackling this and building a diverse, highly skilled and exciting sector across the board – from shipbuilders to bosuns.

    This funding will help us tackle this problem by supporting the excellent work being done by charities and social organisations and fostering new programmes.

    I am also pleased to be launching our recovery route map, which will help to build a resilient, innovative and future-facing maritime sector for generations to come.

  • Grant Shapps – 2022 Comments on Legislation to Allow Temporary Staff During Strikes

    Grant Shapps – 2022 Comments on Legislation to Allow Temporary Staff During Strikes

    The comments made by Grant Shapps, the Secretary of State for Transport, on 23 June 2022.

    Despite the best efforts of militant union leaders to bring our country to a standstill, it’s clear this week’s strikes did not have the desired impact due to more people being able to work from home. However, far too many hard working families and businesses were unfairly affected by union’s refusal to modernise.

    Reforms such as this legislation are vital and will ensure any future strikes will cause even less disruption and allow adaptable, flexible, fully skilled staff to continue working throughout.

  • Trudy Harrison – 2022 Statement on the HGV Levy Reform Consultation

    Trudy Harrison – 2022 Statement on the HGV Levy Reform Consultation

    The statement made by Trudy Harrison, the Parliamentary Under-Secretary of State for Transport, in the House of Commons on 20 June 2022.

    My noble Friend the Parliamentary Under-Secretary of State for Transport (Baroness Vere of Norbiton) has made the following ministerial statement.

    Today the Government are publishing a consultation on reforming the heavy goods vehicle (HGV) levy. The HGV levy has been suspended since 1 August 2020 to support the haulage sector and aid pandemic recovery efforts. Today’s consultation seeks industry views on two ways in which the levy could be reformed when the suspension ends as planned on 31 July 2023.

    Firstly, the Government are considering reforming the HGV levy so that it is more reflective of the environmental performance of the vehicle. The levy would be restructured to be based on the weight of the vehicle, as an indicative proxy for carbon dioxide emissions. If this reform were carried out, the majority of UK vehicles will pay less or the same than they did before the previous levy was suspended. The alternative would be to continue with the current structure and rates.

    Second, the Government are minded to reform the levy liability for foreign HGVs, such that they pay only when driving on major roads. This is to clarify that the levy design is unambiguously in line with the Government’s international obligations.

    The consultation will be published on the Department for Transport website and will run for four weeks.

  • Wendy Morton – 2022 Statement on the Restoring Your Railway Project

    Wendy Morton – 2022 Statement on the Restoring Your Railway Project

    The statement made by Wendy Morton, the Minister of State at the Department for Transport, in the House of Commons on 20 June 2022.

    Today I am pleased to announce further development funding for nine rail schemes under the restoring your railway fund. This brings communities in Yorkshire, Staffordshire, County Durham and beyond one step closer to being reconnected to the rail network, with the transformational levelling up opportunities for jobs, homes and education that public transport provides.

    The restoring your railway fund is making substantial progress to restore previously closed rail lines: the £500 million commitment is supporting the development or delivery of over 45 schemes across England and Wales, and we have already reintroduced services to the Dartmoor line between Okehampton and Exeter.

    I am today announcing further funding for schemes that entered restoring your railway as early-stage ideas, which have already been supported through the Fund to develop a Strategic Outline Business Case and will now be progressing further. I am also announcing funding for proposals at more advanced stages.

    The nine schemes receiving further funding with the potential to level up and reconnect communities are: the Barrow Hill line between Sheffield and Chesterfield; the Ivanhoe line between Leicester and Burton on Trent; new stations at Meir in Staffordshire, Haxby in Yorkshire, Devizes in Wiltshire and Ferryhill in County Durham; Aldridge station and line upgrade in Walsall; reinstating the Fleetwood line; and the Mid Cornwall Metro scheme for services between Newquay and Falmouth.

    More than 50 years since the railways were radically reshaped during the infamous Beeching cuts of the 1960s, when thousands of miles of both track and stations were closed, the restoring your railway Fund is now focused on developing and delivering the benefits of the schemes within its portfolio. If delivered, these lines and stations will make a real contribution to levelling up the country, reinvigorating high streets and breathing new life into previously cut off areas.

    Alongside this announcement we are publishing a restoring your railway fund update, which sets out progress on all schemes that have received funding and will be placed in the Libraries of both Houses, as well as being publicly accessible online through the www.gov.uk website.

  • Andrew Stephenson – 2022 Statement on HS2 Phase 2b Western Leg: Crewe to Manchester

    Andrew Stephenson – 2022 Statement on HS2 Phase 2b Western Leg: Crewe to Manchester

    The statement made by Andrew Stephenson, the Minister of State at the Department for Transport, in the House of Commons on 20 June 2022.

    As set out in a written ministerial statement to Parliament on 6 June 2022, the Government are today publishing a supplement to the January 2022 update to the High Speed 2 (HS2) Crewe – Manchester Strategic Outline Business Case (SOBC). This supplement to the SOBC sets out the implications of removing the Golborne Link from the High Speed (Crewe – Manchester) Bill scheme.

    The January 2022 update to the SOBC set out the importance of the proposed scheme in linking Manchester to the high-speed network, reducing journey times between the UK’s biggest economic regions—the south-east, midlands, and north-west—and generating much needed passenger and network capacity on the West Coast Mainline (WCML), the UK’s busiest mixed rail use corridor. It also outlined the scheme’s central role in rebalancing the UK economy by providing the platform for economic growth and regeneration in Manchester and the North West, and its importance as the strategic enabler for Northern Powerhouse Rail (NPR) and the wider Integrated Rail Plan for the North and Midlands (IRP).

    This scheme also included the Golborne Link, a proposed connection from the HS2 network near Hoo Green to the WCML just south of Wigan, aimed at increasing the number of HS2 services between England and Scotland.

    As announced on 6 June 2022, subject to the will of Parliament, the Government no longer intend to seek powers to construct the Golborne Link as part of this Bill. As Sir Peter Hendy’s Union Connectivity Review made clear the Golborne link might not resolve all the rail capacity constraints on the West Coast Mainline between Crewe and Preston. The Government will therefore take time to consider alternatives which deliver similar benefits to Scotland as the Golborne link, so long as these deliver for the taxpayer within the £96 billion envelope allocated for the Integrated Rail Plan, and to understand the deliverability of the alternatives.

    HS2 is an essential factor in achieving the transformative impact of the Government’s £96 billion Integrated Rail Plan, connecting our major cities, including connections between the North and Midlands. With other elements of the IRP, it will encourage businesses to invest beyond London while retaining ready access to the capital. It will make it easier for people to find high-wage, high-skilled jobs without having to travel south. This will help drive productivity and growth, benefiting the whole country.

    A copy of the supplement to the Strategic Outline Business Case will be placed in the Libraries of both Houses and made publicly accessible online.