Blog

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, what assets his Department has sold and leased back over the last 12 months; what the sale price was of each asset so sold; and what estimate his Department has made of the cost to the public purse of leasing back each such asset over the period of the lease.

    Dr Andrew Murrison

    This information is not held centrally and could be provided only at disproportionate cost. However, normally the Ministry of Defence sells its assets with vacant possession, only leasing back properties for short periods pending relocation of the occupants.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, what deviations or exemptions from the Military Air Systems Certifications Process were made for the Airseeker aircraft; when those deviations or exemptions were made; and who authorised each such deviation or exemption.

    Mr Philip Dunne

    I refer the hon. Member to the answer I gave on 16 June 2014, (Official Report, column 364W), to the hon. Member for Plymouth, Moor View (Alison Seabeck).

    Ongoing work will progressively refine this release as additional information becomes available and further analysis is conducted.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, what the near cash projected spending on the Equipment Plan and Equipment Support Plan is for each year to 2018.

    Mr Philip Dunne

    Projected spending on the Equipment Plan and Equipment Support Plan is detailed in the annual Defence Equipment Plan. The most recent edition was published on 12 February 2014.

    https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/279440/defence_equipment_plan_2013.pdf

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, what estimate he has made of the total cost of disposal of Nimrod MR4A associated material at RAF Kinloss.

    Mr Philip Dunne

    The current net cost of removal of Nimrod MR4A material is £86,000. However, we expect the final net cost to be lower since some of the material removed from site has yet to be sold.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, when HMS Ocean will be declared fit to deploy; and when she will depart on Exercise Cougar 14.

    Mr Mark Francois

    HMS OCEAN is completing refit and will soon put to sea. However, I am withholding precise details of HMS OCEAN’s future programme as their disclosure would, or would be likely to, prejudice the capability, effectiveness or security of the Armed Forces.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, what the loudest decibel levels are that are produced by JSF 35B during operations aboard an aircraft carrier.

    Mr Philip Dunne

    The loudest operation to be conducted by the F-35B onboard an aircraft carrier is a Military Power take-off. The measured aircraft sound level of a Military Power take-off is approximately 145 dB at 135 degrees from the aircraft nose centre line, at a distance of 50 feet from the rear of the aircraft. The Military Power take-off is a standard operating procedure and managing exposure to noise is an integral part of normal embarked operations. This level of noise is similar to that of the Harrier, F18’s, F15’s and the same level as produced by an F-16.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, how many (a) actual and (b) simulated flight hours pilots need to adjust from a fast jet with a heads-up-display to one with only a helmet mounted display.

    Mr Philip Dunne

    The adjustment from a fast jet aircraft with a heads-up display to one with a helmet mounted display cannot be quantified in hours as pilots are trained to operate the aircraft as a whole.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, if he will place in the Library a copy of the final investment approval for Project Teutates.

    Mr Philip Dunne

    I am unable to place a copy of the business case that sought investment approval for project Teutates in the library as the document contains classified information.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, what risk assessment he has made of the safety of aircraft handlers and maintenance personnel due to the noise produced by the Joint Strike Fighter.

    Mr Philip Dunne

    Full assessment has been made regarding the noise levels of the Joint Strike Fighter. Personnel noise exposure risk is managed in accordance with The Control of Noise at Work Regulations, 2005 and will include a combination of personal protective equipment and procedures to control daily noise exposure, normal practice for personnel operating machinery such as helicopters, tanks and other aircraft.

  • Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    Angus Robertson – 2014 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Angus Robertson on 2014-06-16.

    To ask the Secretary of State for Defence, if he will place in the Library copies of agreements with the French government to (a) undertake joint research at the Atomic Weapons Establishment Orion and Commissariat à l’Énergie Atomique Laser Megajoule, (b) allow use of hydrodynamics research facility at the Atomic Weapons Establishment and (c) peer review technical and scientific data underpinning nuclear warhead certification.

    Mr Philip Dunne

    The agreements with the French Government to undertake joint research described are detailed in Article 1 of the TEUTATES Treaty 2010. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228571/7975.pdf