  • Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Monaghan on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what the total length is of tunnels for each specific diameter being constructed by the London Power Tunnels Project; and what length of each such type of tunnel has been constructed to date.

    Andrea Leadsom

    National Grid has said that:

    The total length of the tunnels is 32km and tunnelling was completed in March 2015.

    19.6km of the network was constructed using a 3m internal diameter tunnel boring

    machine

    • Willesden to St John’s Wood 3m diameter tunnel – 7.4km

    • Wimbledon to Kensal Green 3m diameter tunnel – 12.2km.

      12.4km of the network was built using a 4m internal diameter tunnel boring machine

      – St John’s Wood to Hackney 4m diameter tunnel.

  • Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Monaghan on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what recent estimate she has made of the cost to the National Grid of the London Power Tunnels project; and how much of that cost is related to (a) civil engineering, (b) electrical engineering and (c) equipment.

    Andrea Leadsom

    National Grid has said that the overall cost of the project is around £1bn and while it is always difficult to breakdown costs simply into different engineering elements, they have estimated the following:

    Tunnels and associated mechanical and electrical work 50%

    High voltage cable procurement, installation and testing 15%

    Substation works (including civil ground works at these locations) 26%

    Land and required permissions 9%

    Ofgem is responsible for regulating National Grid, to ensure that the work they do represents value for money for consumers.

  • Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Monaghan on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, whether the London Power Tunnels Project is (a) on schedule for completion in 2018 and (b) within budget.

    Andrea Leadsom

    National Grid has said that:

    1. The London Power Tunnels Project is on schedule for completion in 2018 with all significant work completed in 2017 a year ahead of the original programme.

    2. The London Power Tunnels Project is currently within budget.

  • Lisa Nandy – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Lisa Nandy – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Lisa Nandy on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what discussions her Department has had with other government departments on the potential for the construction of new nuclear reactors in Somerset independent of the proposals by EDF at Hinkley Point C.

    Andrea Leadsom

    DECC has had no discussions with other government departments on the potential for the construction of new nuclear reactors in Somerset independent of the proposals by EDF at Hinkley Point C.

  • Michael Dugher – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Michael Dugher – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Michael Dugher on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what progress her Department has made on rolling-out smart meters as standard by the end of 2020; and what estimate she has made of the number of homes that will have a smart meter installed by the end of each year to 2020.

    Andrea Leadsom

    The Government is committed to every home and small business being offered smart meters by the end of 2020. The Programme is making good progress. Over 3 million meters have been installed in homes and business across Great Britain in the Foundation stage of the Programme, ahead of the nationwide roll-out.

    Suppliers’ annual projections on the number of smart meters installed each year to 2020 can be found on page 28 of the Fourth Annual Report on the Roll-out of Smart Meters:

    https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/477258/Smart_Meters_Implementation_Programme_Annual_Report_2015.pdf

    “

  • Helen Hayes – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Helen Hayes – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Helen Hayes on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what assessment she has made of the adequacy of extra reserve capacity in the National Grid in 2016 and 2017.

    Andrea Leadsom

    National Grid has procured 3.6GW of a total volume cap of 3.7GW (de-rated capacity). This is the amount that National Grid calculated in their ‘volume Requirement methodology’ to assess the amount of reserve that would be considered adequate, considering a number of sensitivities. This has been approved by the regulator, Ofgem.

  • Michael Dugher – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Michael Dugher – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Michael Dugher on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what steps her Department is taking to ensure the data security of smart meters.

    Andrea Leadsom

    The Department has worked with industry and security experts, including GCHQ, to design a smart metering system that has robust end-to-end security. The Department’s Data Access and Privacy Framework puts consumers in control of who has access to their data except where energy suppliers and networks have access for regulated purposes, such as to enable accurate monthly billing. All organisations involved in communicating with smart meters are required to comply with a detailed set of security obligations, with each aspect of the system subject to regular, independent security assurance.

    Smart meters will not store data such as a consumer’s name, address or bank details. A key design principle for the system is the maintenance of user privacy. Any transaction of data which could be deemed ‘personal’, including energy consumption data, is encrypted so only the intended recipient can see it.

  • Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Paul Monaghan – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Paul Monaghan on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what the total gross expenditure on the London Power Tunnels Project is to date.

    Andrea Leadsom

    National Grid has said that as of 1 May 2016 total gross expenditure on the programme of works on the London Power Tunnels Project is approximately £780m.

    Ofgem is responsible for regulating National Grid to ensure that the work they do represents value for money for consumers.

  • William Cash – 2016 Parliamentary Question to the Department for Energy and Climate Change

    William Cash – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by William Cash on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what assessment her Department has made of the effect of the expansion of new electricity interconnectors on (a) the capacity market auction price and (b) long-term investment in gas-fired electricity generation.

    Andrea Leadsom

    We are confident that the Capacity Market is the right tool to bring forward new capacity including gas as it is needed. The participation of interconnectors in the Capacity Auction is expected to increase competition among capacity providers in the auction helping to take clearing prices as low as possible for consumers. The security of supply contribution that interconnection makes is assessed annually, based on detailed market modelling to determine anticipated electricity flows from connected markets at times of GB system stress. The government published an impact assessment last year on the inclusion of interconnectors in the Capacity Market which is available here:

    http://www.legislation.gov.uk/ukia/2015/187/pdfs/ukia_20150187_en.pdf.

    Both new gas and new interconnectors are likely to be important parts of the long-term investment we need in new capacity to ensure energy supply.

    “

  • Barry Gardiner – 2016 Parliamentary Question to the Department for Energy and Climate Change

    Barry Gardiner – 2016 Parliamentary Question to the Department for Energy and Climate Change

    The below Parliamentary question was asked by Barry Gardiner on 2016-05-18.

    To ask the Secretary of State for Energy and Climate Change, what steps she is taking to work with other departments to formulate the Government’s response to the recommendation of the Energy and Climate Change Committee in its Fifth Report of Session 2015-16, on Setting the fifth carbon budget, HC 659, that effective drivers need to be put in place by Government to encourage innovation and investment for transport, buildings and agriculture.

    Andrea Leadsom

    We are currently working closely with other Government departments to determine the right approach to reducing emissions in the 2020s.

    We will publish the successor to 2011 Carbon Plan, in due course. The new plan will set out our policies and proposals for meeting the UK’s carbon budgets, and will cover all sectors of the economy, including transport, agriculture and buildings.