    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, what information his Department holds on the estimated difference in cost between locating the Sheffield High Speed 2 station in the city centre and locating it in Meadowhall.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.

  • Antoinette Sandbach – 2016 Parliamentary Question to the Department for Transport

    Antoinette Sandbach – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Antoinette Sandbach on 2016-02-11.

    To ask the Secretary of State for Transport, what estimate his Department has made of the amount of agricultural land lost to UK farm production as a result of the construction of High Speed 2.

    Mr Robert Goodwill

    Approximately 2,750 hectares of agricultural land is permanently required for Phase One of HS2. 4,800 hectares will be taken during the construction period, but much of this will be returned to the existing agricultural condition following construction.

    A detailed assessment of the amount of agricultural land required for future Phases of HS2 will be undertaken alongside the deposit of the relevant hybrid Bills for these phases.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, what information his Department holds on the estimated difference between the current and original cost estimates of (a) locating the Sheffield High Speed 2 station in the city centre and (b) locating it in Meadowhall.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, whether his Department has received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria in which Network Rail was involved.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, whether proposals for Northern Powerhouse Rail are based on city centre to city centre connectivity and on ensuring half-hour journeys between Leeds, Sheffield and Manchester.

    Andrew Jones

    Northern Powerhouse Rail is the government and Transport for the North’s shared vision to dramatically improve frequencies and journey times between the city centres of Liverpool, Manchester, Sheffield, Leeds, Hull, Newcastle, and Manchester Airport.

    The aspiration for journey times between Leeds, Sheffield and Manchester is 30 minutes.

    Since the publication of the March 2015 Northern Transport Strategy, the government and Transport for the North have undertaken significant work to understand what the capability of the rail infrastructure would need to be, by route, to deliver such transformational connectivity.

    An updated Strategy will be published in the spring.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, if he will publish the independent costings of linking High Speed 2 to the Northern Powerhouse Rail work for both Manchester and Sheffield city centre station locations.

    Andrew Jones

    Since the publication of the March 2015 Northern Transport Strategy, the government and Transport for the North have undertaken significant work to understand what the capability of the rail infrastructure – between and within cities – would need to be to deliver the Northern Powerhouse Rail vision.

    Network Rail and HS2 Ltd. are currently working to establish the scale of investment required. We expect to have an understanding of the relative scale of costs by autumn 2016.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, what his policy is on ensuring that High Speed 2 stations should be located where they can deliver maximum impact on public investment.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, what estimate he has made of the (a) number of additional jobs and (b) amount of additional housing resulting from a Meadowhall High Speed 2 station location.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, what estimate he has made of the (a) number of additional jobs and (b) amount of additional housing resulting from a Victoria High Speed 2 station location.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.

  • Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    Paul Blomfield – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Paul Blomfield on 2016-02-11.

    To ask the Secretary of State for Transport, what methodology his Department used to determine that the proposed Sheffield station should be at Meadowhall and not Victoria; and whether that methodology has been independently verified.

    Mr Robert Goodwill

    Analysis of the Sheffield City Region station options was published in the ‘Engineering options report; West Midlands to Leeds’ dated March 2012. This included analysis of several station sites around the city centre.

    The current estimated difference in cost between locating a High Speed station at Victoria and Meadowhall is £680m. Previous work on the cost of options at Victoria and other city centre sites are not comparable to the current estimate given above. With regards to the Meadowhall station, following the 2013 public consultation, no significant changes have been made to the original station design therefore there have not been any changes in cost.

    When recommending a station location HS2 Ltd. uses a number of criteria, including;

    1. engineering and construction feasibility;
    2. sustainability;
    3. demand considerations, including journey times;
    4. cost; and
    5. wider impacts

    Potential options were sifted by HS2 Ltd. according to these criteria. To support and challenge this approach, external stakeholders and advisors from the Department’s Project Representative Team were involved in reviewing the process and outcomes where appropriate. Further information about the appraisal process can be found in the 2012 ‘Options for phase two of the high speed rail network’ report and 2013 ‘Appraisal of Sustainability’ report. Both of these documents are available on the government website.

    Analysis undertaken by HS2 shows that the introduction of the Sheffield Meadowhall HS2 station could support up to 5,400 jobs and up to 300 residential units, while a HS2 station at Victoria could support an estimated 9,000 jobs and 900 housing units.

    Finally, I can confirm that Department for Transport officials have received a copy of Sheffield City Region’s study into connectivity for a city centre High Speed 2 station at Victoria which Network Rail was involved in.