Author: admin

  • Naz Shah – 2016 Parliamentary Question to the Department for Culture, Media and Sport

    Naz Shah – 2016 Parliamentary Question to the Department for Culture, Media and Sport

    The below Parliamentary question was asked by Naz Shah on 2016-02-08.

    To ask the Secretary of State for Culture, Media and Sport, how much his Department spent on access to the arts in Yorkshire and Humber region between (a) May 2015 and February 2016 and (b) May 2010 and April 2015.

    Mr Edward Vaizey

    The Government continues to support the fantastic range of arts in the culture in Yorkshire and the Humber through its public investment in the arts, distributed by Arts Council England, as well as investment in cultural projects and programmes including £1.5 million for the Ferens Art Gallery in Hull to support its redevelopment and £1 million to support the Yorkshire Festival which will celebrate the region’s culture this summer.

    The Arts Council has provided the following funding to Yorkshire during the dates specified:

    Funding Year

    Total

    2015/2016: 1st April – 8 Feb 2016

    £46,399,085

    Funding Year

    Total

    2010/2011

    £36,013,760

    2011/2012

    £47,661,513

    2012/2013

    £64,126,617

    2013/2014

    £46,717,549

    2014/2015

    £53,628,743

  • Tim Farron – 2016 Parliamentary Question to the Ministry of Defence

    Tim Farron – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Tim Farron on 2016-02-08.

    To ask the Secretary of State for Defence, how many (a) reconnaissance, (b) combat and (c) other missions were flown by RAF aircraft over Iraq in the last 12 months.

    Penny Mordaunt

    The number of reconnaissance, combat and other missions between 1 February 2015 and 1 February 2016 are detailed in the table below. The majority of aircraft flying missions in Syrian airspace will have flown over Iraqi airspace as well. Reaper, Tornado and Typhoon are multi-role aircraft and as such can be deployed in both a combat mission and a reconnaissance mission. Other missions have been defined as those involved in the transportation of people or equipment.

    Syria

    Iraq

    Reconnaissance Missions

    435

    906

    Combat Missions

    64

    699

    Other

    0

    484*

    *This figure does not include C17, which is estimated to have flown two missions a month in the period in question. The records for C17 are not held centrally and could only be provided at disproportionate cost.

  • Tim Farron – 2016 Parliamentary Question to the Ministry of Defence

    Tim Farron – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Tim Farron on 2016-02-08.

    To ask the Secretary of State for Defence, how many (a) reconnaissance, (b) combat and (c) other missions were flown by RAF aircraft over Syria in the last 12 months.

    Penny Mordaunt

    The number of reconnaissance, combat and other missions between 1 February 2015 and 1 February 2016 are detailed in the table below. The majority of aircraft flying missions in Syrian airspace will have flown over Iraqi airspace as well. Reaper, Tornado and Typhoon are multi-role aircraft and as such can be deployed in both a combat mission and a reconnaissance mission. Other missions have been defined as those involved in the transportation of people or equipment.

    Syria

    Iraq

    Reconnaissance Missions

    435

    906

    Combat Missions

    64

    699

    Other

    0

    484*

    *This figure does not include C17, which is estimated to have flown two missions a month in the period in question. The records for C17 are not held centrally and could only be provided at disproportionate cost.

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, when he expects the (a) demonstration phase and (b) manufacture phase of the Successor submarine programme to begin.

    Penny Mordaunt

    We expect to approve the next stage of the Successor submarine programme later in 2016.

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, what the amount set aside for contingency funding was within the overall equipment budget of his Department in each of the last six years.

    Mr Philip Dunne

    Centrally held contingency funding for the Defence Equipment Plan (EP) was introduced for the first time in 2012, at which point it totalled £4.8 billion over the 10 year planning period. The level of contingency has remained broadly stable over the subseqent four years, as shown in the table below.

    EP Contingency by Financial Year

    2012-13

    2013-14

    2014-15

    2015-16

    10 Year Total

    £4.8 billion

    £4.7 billion

    £4.6 billion

    £4.3 billion

    “

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, what the cost was of refitting and refuelling HMS Vengeance between March 2012 and December 2015.

    Mr Philip Dunne

    The Long Overhaul Period (Refuel) of HMS Vengeance between March 2012 and December 2015 was carried out under a contract worth just over £350 million.

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, pursuant to the Answer of 3 February 2016 to Question 24277, how many Sea King (a) Mk3, (b) Mk3a, (c) Mk4 and (d) Mk5 aircraft are planned to be taken out of service in 2016; and what plans the Government has to replace those assets.

    Mr Philip Dunne

    A total of 32 Sea King aircraft are planned to be taken out of service during 2016:

    10 Mk3

    2 Mk3a

    9 Mk4

    11 Mk5

    The Search and Rescue role provided by these Sea King helicopters is to be delivered by contractor-provided services. Other roles delivered by these aircraft will transition to the Merlin fleet operated by the Royal Navy.

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, pursuant to the Answer of 2 February 2016 to Question 24281, how many maritime patrol aircraft from (a) the US, (b) Canada, (c) France and (d) Germany were temporarily deployed to RAF Lossiemouth in 2015.

    Penny Mordaunt

    The table below shows the total number of maritime patrol aircraft (MPA), from the US, Canada, France and Germany, temporarily deployed to RAF Lossiemouth at some point during 2015.

    Country

    Number of aircraft

    US

    11

    Canada

    3

    France

    5

    Germany

    2

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, pursuant to the Answer of 4 February 2016 to Question 25004, (a) for how many days (a) HMS Daring, (b) HMS Dauntless, (c) HMS Diamond, (d) HMS Dragon, (e) HMS Defender and (f) HMS Duncan were deployed on operations and (b) in which theatre they were so deployed in (i) 2011, (ii) 2012, (iii) 2013 and (iv) 2014.

    Penny Mordaunt

    The information requested is provided below. In answering this question, I have defined ‘deployed on operations’ as times away from UK waters for extended periods.

    In 2011, the Type 42 Destroyers were deployed on operations. No Type 45 Destroyer was deployed away from the UK.

    2012

    Ship

    Deployment

    Number of Days

    HMS DARING

    Operation Kipion: Gulf Region

    210

    HMS DAUNTLESS

    Atlantic Patrol Tasking (South)

    209

    HMS DIAMOND

    Operation Kipion: Gulf Region

    191

    2013

    Ship

    Deployment

    Number of Days

    HMS DRAGON

    Operation Kipion: Gulf Region

    254

    HMS DARING

    Global Deployment

    277

    2014

    Ship

    Deployment

    Number of Days

    HMS DIAMOND

    Operation Recsyr: protecting and escorting ships transporting chemicals from Syria

    163

    HMS DEFENDER

    Operation Kipion: Gulf Region

    193

    HMS DRAGON

    Atlantic Patrol Tasking (South)

    198

    When not deployed on operations, all Type 45 ships would have undertaken activities such as sea trials, training, engagement, provisioning or been in a maintenance period.

  • Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    Emily Thornberry – 2016 Parliamentary Question to the Ministry of Defence

    The below Parliamentary question was asked by Emily Thornberry on 2016-02-08.

    To ask the Secretary of State for Defence, pursuant to the Answer of 4 February 2016 to Question 25075, from which countries steel was sourced for the manufacture of the offshore patrol vessels currently under construction; and what proportion of that steel was sourced from each such country.

    Mr Philip Dunne

    For the Offshore Patrol Vessels (OPV) currently under construction around 4,000 tonnes of steel is needed in total for the three ships. Dent Steel Services (UK) was awarded the contract by BAE Systems to source and supply the steel required for the OPVs.

    Around 60 per cent of the total steel required for the OPVs consists of thin plate (between four and five millimeters ) which can be sourced only from steel mills capable of rolling the material to that thickness.

    UK steel suppliers were approached by Dent but none were able to meet the thickness specification. As a result this steel was sourced from overseas suppliers.

    Around 60 per cent of the overall requirement was sourced from Sweden; 20 per cent from UK steel mills; 10 per cent from Spain; and the remaining 10 per cent from Dent’s existing stock, of unknown origin. The use of overseas suppliers was necessary to obtain the required specification of steel at a competitive price for delivery at the time required.