Category: Transportation

  • Vicky Foxcroft – 2022 Speech on Southeastern Railway Timetable Changes

    Vicky Foxcroft – 2022 Speech on Southeastern Railway Timetable Changes

    The speech made by Vicky Foxcroft, the Labour MP for Lewisham Deptford, in Westminster Hall, the House of Commons, on 6 December 2022.

    It is an absolute pleasure to serve under your chairpersonship for the first time, Ms Harris. I congratulate my hon. Friend the Member for Eltham (Clive Efford) on securing this important debate and on his speech. He has made many key points with which I wholeheartedly agree.

    Like many colleagues, I have worked closely with local transport users during my time as an MP, and I am here today to share the concerns of constituents who have contacted me following the publication of the amended timetable. As we have heard from many Members, it is fair to say that there has been widespread anger with the Department for Transport for allowing Southeastern to press ahead with the changes without consulting its passengers.

    Although I can appreciate the removal of the requirement during the pandemic so that operators could bring in changes more quickly, most Members would agree that we are now at a point at which passenger numbers have restabilised. In response to a written question from my hon. Friend the Member for Sheffield, Heeley (Louise Haigh), the Department stated:

    “There will be less than 1% fewer typical weekday passenger services across the…network compared to the current timetable.”

    Well, I can tell the Chamber that users of St Johns station in my constituency are expecting to lose 19 services per day thanks to the rerouting of the Hayes line’s trains to Charing Cross.

    I have received representations from two very active local organisations: St John’s Society and Brookmill Road Conservation Area Society, as well as from individual constituents. St Johns has had its services reduced in recent years, and the walk to nearby stations—New Cross and Lewisham—is long and uphill for many, causing difficulties for disabled people and those with young children.

    Lewisham in particular suffers, as has been mentioned by many colleagues, with overcrowding at peak times and a woefully inaccessible station. The situation will only get worse as further large residential developments are completed in Lewisham, as Members have referenced in relation to their own constituencies. When the remaining peak-time trains reach St Johns—the next stop on the line—they might be too full for passengers to be able to join them. There are environmental considerations, too, if people are forced to use their car when previously they would have opted to travel by train.

    Similarly, users at Blackheath station in the constituency of my hon. Friend the Member for Lewisham East (Janet Daby), just over the border from my constituency, have been hit with the news that there will be no direct services to London Charing Cross during off-peak hours, and many peak trains will also be cut.

    I will conclude my comments. While the overall number of services might not be significantly reduced, that 1% figure in no way reflects the impact that the changes will have on individual stations and communities.

  • Louie French – 2022 Speech on Southeastern Railway Timetable Changes

    Louie French – 2022 Speech on Southeastern Railway Timetable Changes

    The speech made by Louie French, the Conservative MP for Old Bexley and Sidcup, in Westminster Hall, the House of Commons, on 6 December 2022.

    Thank you for chairing, Ms Harris, and I thank the hon. Member for Eltham (Clive Efford) for securing this important debate. Although we often differ in our views, when it comes to Southeastern trains we share frustrations over the timetable changes that will come into force next week. On my first anniversary of being sworn into Parliament, local residents will not be surprised to see me standing up and fighting against Southeastern for them again today.

    The issue of no consultation has been mentioned by several colleagues. The new Minister is already aware of how frustrated MPs and members of the public are over not being informed of the timetable changes by Southeastern until it was too late. In recent weeks, people in Bexley have experienced two transport shocks. First, Southeastern pushed through these changes under the guise that they are demand based, when they clearly go much further. Secondly, the Mayor of London ignored the wishes of the clear majority of Londoners who rejected his outrageous ULEZ—ultra low emission zone—tax raid on drivers in outer London. We have had no consultation on the trains, and a sham consultation by the Mayor. That helps explain my anger and that of local residents across Bexley.

    The Minister and many Members here will be aware that, since Southeastern’s announcement in late September, I have been running a constituent survey on the timetable changes. The thousands of responses to the survey highlight that the most impactful changes are the reduction in Albany Park station services in my constituency, the loss of off-peak Charing Cross services on the Bexleyheath line—we have heard about that from colleagues already—and the loss of the loop service on the Sidcup line, which I will talk about in turn.

    I echo the comments of my right hon. Friend the Member for Bexleyheath and Crayford (Sir David Evennett) on the loss of off-peak Charing Cross services and the impact on passengers travelling to the west end for leisure and work. As someone who commuted to the City for more than a decade from the likes of Welling and Sidcup train stations, I can confirm that Cannon Street services at those times are of minimal benefit to local residents and will force thousands of passengers to change trains at London Bridge. That is of particular concern, given the impact on the more vulnerable residents in our communities and the general increase in travel times that they will experience. I hope that the Minister will at least explain what support Southeastern is putting in place in the short term to help passengers forced to change at London Bridge station.

    The extent of the changes in the new timetable are arguably best reflected by the drastic, near 50% reduction in Albany Park services. Peak services have been reduced from seven trains per hour to four, and off-peak services from four trains per hour to two. That reduction has not only led to concerns about overcrowding and long waits in the event of cancellation, but resulted in the loss of direct services to Lewisham station, which is used by commuters from Albany Park to the DLR and Canary Wharf. I visited that station during my campaign against the timetable changes and I saw at first hand how busy it is, particularly during peak times on Tuesday to Thursday. I remain concerned that that is not fully accounted for in the passenger numbers.

    I raised those concerns with the Minister and at our latest meeting with Southeastern, with my right hon. Friend the Member for Bexleyheath and Crayford. I am grateful for Southeastern’s commitment to look at the live train-loading data for that station daily, and for the fact that it has since visited Albany Park station to reassess passenger numbers. I again request, through the Minister, that it provides the latest peak-time passenger numbers and capacity for the station, especially for Tuesday to Thursday. Furthermore, I would be grateful if the Minister can use his position to ask Southeastern again why there has been such a significant reduction in trains stopping at Albany Park station. Will he seek assurance about the future of the station, which is frequently used by commuters in a residential area with few alternative transport connections? There have been some silly rumours floating around locally that the station is closing. I hope the Minister will put them to bed by confirming that there are no plans to close it.

    At all meetings, I have expressed my considerable disappointment at the loss of the loop service on the Sidcup line, which is used by many constituents, including to connect to the Elizabeth line and for Charlton Athletic fixtures. It is also used by children and parents travelling to school. Again, I am concerned about the data that Southeastern used to inform that decision. The time period used to capture passenger numbers does not incorporate the increase in passengers on the service since the Elizabeth line was opened. It would be a shame for residents to lose that connecting service, especially given the four-year delay and the billions it has cost taxpayers and businesses in our area. I again urge Southeastern to provide more services to Abbey Wood on the Sidcup line, especially off peak and at weekends.

    As Members have said, Southeastern has consistently stated that the timetable changes have been demand-led, and that their purpose is to reduce crossovers in Lewisham, thereby improving reliability and reducing delays. I fundamentally disagree with that reasoning, especially given the consistent increase in passenger numbers since the pandemic and the £250 million investment in junction works at Lewisham over the past couple of years. Those engineering works, which have often required full and partial line closures, have been to improve track, signalling and capacity at Lewisham to meet demand “for decades ahead”. I am frustrated that my constituents have been negatively affected by regular disruption caused by union strikes and the works, which includes a planned nine-day full closure of the Bexleyheath line later this month, only a couple of weeks after the timetable changes.

    My constituents have tolerated that major disruption to their journeys over the past couple of years on the basis that the works are

    “to meet the demands of the railway today.”

    That is a real kick in the teeth, because they are now losing a substantial number of services and the choice of termini to reduce crossovers at Lewisham—the very issue the works were said to address. I hope the Minister will address that issue, because that could be a massive waste of taxpayers’ money. It should be a good thing for the area, not a bad thing.

    I emphasise again my disappointment and outrage at the lack of consultation for such drastic changes, which will have a detrimental impact on my constituents and their ability to travel for work, school and leisure. Given that Bexley does not benefit from direct access to the underground, rail services are the principal means of transport into and out of London, as well as for travelling to other areas in the south-east. It is therefore vital that the frequency and links to a range of central London stations are preserved. I continue to call for urgent concessions and reversals to many of the changes, particularly ahead of the new timetable in May.

  • Matthew Pennycook – 2022 Speech on Southeastern Railway Timetable Changes

    Matthew Pennycook – 2022 Speech on Southeastern Railway Timetable Changes

    The speech made by Matthew Pennycook, the Labour MP for Greenwich and Woolwich, in Westminster Hall, the House of Commons on 6 December 2022.

    It is an absolute pleasure to serve with you in the Chair, Ms Harris, and I congratulate my hon. Friend the Member for Eltham (Clive Efford) on securing this important debate and on the powerful case he made in opening it.

    The deeper that I have dug into Southeastern’s stated rationale for its planned December timetable changes, the more convinced I have become that it simply does not add up. No one denies that we have seen a reduction in passenger numbers on Southeastern services post pandemic. However, given the difficulties inherent in determining levels of permanent demand reduction, not least given the fact that passenger numbers across the country continue to recover steadily, it beggars belief, quite honestly, that levels of demand as they were six months ago are being used to justify the kind of radical and disruptive change entailed by the timetable that is due to come into force next week.

    It is worth bearing in mind that Southeastern introduced a reduced timetable on the Greenwich line in November 2020, but it was forced to restore the full peak hour service in January of this year because of overcrowding. Yet we are now told that similar service reductions are essential and that despite there being 302 fewer weekday services and 426 fewer weekend services across the network, as well as extremely large gaps between services during peak periods, there will be more than enough space to meet demand.

    In the face of significant public anger, Southeastern has offered all manner of additional reasons why these planned timetable changes must be made. We are told by Southeastern representatives that the current timetable has:

    “several disbenefits which will only get worse as customers return to the railway.”

    That statement not only contains an implicit admission that demand is expected to continue to rise, but the company has also failed to make clear what those disbenefits are.

    We are also told that the timetable is needed to deal with:

    “the notorious bottleneck at Lewisham”.

    However, as several colleagues have already mentioned, once again no specific information about delays caused by conflicting movements at or outside Lewisham station has been presented.

    We are also told that Southeastern is an aberration for having metro trains that serve multiple London termini, yet Southern runs services into both Victoria and London Bridge, and Great Northern runs services into King’s Cross and Moorgate, both doing so without issue. We are told that the new timetable was based on feedback from customers and stakeholders, yet there was no engagement campaign with rail user groups and community groups prior to the cackhanded announcement of these changes in late September. Indeed, there has been none since.

    It is hard to escape the conclusion, particularly given that the new timetable closely reflects proposals made prior to the pandemic as part of the 2017 Southeastern franchise tendering exercise, that what we are witnessing is the implementation of plans drawn up long before anyone had heard of coronavirus, under the pretext of post-pandemic changes in travel patterns and ultimately being driven by a desire to cut costs.

    That would certainly explain why Southeastern sought to evade proper scrutiny about these planned changes by seeking and securing from the Department for Transport a formal derogation against the requirement to undertake a consultation exercise in respect of them.

    Responding to that charge, Southeastern has argued that it takes many months to design and consult on a timetable change, and the pace of events meant that it was unable to do so. Yet other train operating companies that are minded to make timetable changes, including South Western Railway and London North Eastern Railway, managed to undertake detailed consultations with their customers despite facing the same pressures.

    Despite the concerns raised by colleagues from across south-east London over several months, it is clear that the Government and the operator will plough ahead and introduce the new timetable on Sunday 11 December. That is deeply regrettable, because of the inconvenience that will be caused to all those passengers who will henceforth be forced to take multiple services to reach their intended destinations, but also because, as my hon. Friend the Member for Eltham mentioned, of the risk of severe overcrowding.

    The Minister owes it to concerned Southeastern passengers to make clear precisely what will happen if demand does exceed service capacity, as I fear it will, so I would be grateful to him if he could address the following questions. Given that departmental responses to written questions suggest that data on overcrowding on the rail network has been discontinued, how will pressure on Southeastern services be monitored in the weeks and months ahead? Assuming that it is monitored in some open and accessible form, what extent of overcrowding will trigger an internal review of the new timetable’s efficacy?

    How serious will matters have to become for services that are to be cut this weekend to be restored, and how quickly can any revisions be made? Indeed, can the Minister confirm that specific revisions to the planned timetable can be made, given that it is premised on significant alterations to termini on various lines? Finally, will the Minister today rule out issuing Southeastern with a further formal derogation and provide a commitment that there will be extensive public consultation ahead of any further timetable changes carried out next year?

    It is not enough for the Minister to argue, as he did in response to a question from my hon. Friend the Member for Eltham at Transport oral questions, that we should all

    “just wait and see how matters progress”.—[Official Report, 24 November 2022; Vol. 723, c. 437.]

    Concerned passengers in my constituency and many others rightly expect answers from the Government as the operator of last resort, and, most importantly, an indication that Ministers will move quickly to amend this new timetable if it proves as damaging as we all fear.

  • David Evennett – 2022 Speech on Southeastern Railway Timetable Changes

    David Evennett – 2022 Speech on Southeastern Railway Timetable Changes

    The speech made by David Evennett, the Conservative MP for Bexleyheath and Crayford, in Westminster Hall, the House of Commons, on 6 December 2022.

    It is a great pleasure to serve under your chairmanship, Ms Harris; it is the first time for me as well. I am particularly pleased to see my personal and political friend, the Minister of State, Department for Transport, my hon. Friend the Member for Bexhill and Battle (Huw Merriman) in his place to respond to the debate.

    I congratulate the hon. Member for Eltham (Clive Efford), from my neighbouring borough, on securing this important debate and thank him for doing so. He made a powerful case with the facts and figures on passenger numbers. That is very important and he has done a good job and a good service for us in south-east London by raising those figures.

    I am grateful for the opportunity to raise such an important issue on behalf of my constituents in Bexleyheath and Crayford. The decisions affect so much and so many people adversely. I am pleased to see present a number of colleagues from both the Conservative and Labour parties, singing from the same hymn sheet. It is important that these issues are considered to be cross-party. We are grateful to participate in the hon. Member for Eltham’s debate.

    Bexley is not on either the London underground or Docklands light railway network. Although the Elizabeth line was originally proposed to run through Bexley and hopefully to Ebbsfleet, it now terminates at Abbey Wood in Greenwich, so there are limited viable alternatives to Southeastern rail services for the people of our area to use to get into central London. For example, although it is fewer than 15 miles from my home in Bexleyheath to Westminster, to travel exclusively by bus would probably take two hours, which is just not practical in any day-to-day commute. My constituents are therefore more reliant than most on rail services to travel to central London, whether to commute, to go to health meetings or for social reasons. For hospitals, work and pleasure, they use the railway and they use those services.

    I know the hon. Member for Eltham is, like me, a regular commuter, as we often travel on the same train. As such, we know and appreciate constituents’ anger about the services that they pay for and share the view that Southeastern, having a monopoly, is failing its customers. However, rather than talk about the shocking service that we have suffered over many years, and which the hon. Gentleman and I have batted away regularly over the past five or six years at least, I shall focus today on the inconsiderate, unfair and damaging new timetable that Southeastern plans to implement later this month.

    The new timetable affects all three of the lines that go through my constituency, as the Bexleyheath, Sidcup and Woolwich lines all go through Bexleyheath and Crayford. My constituency of Bexleyheath and Crayford is currently served badly by those services, and the changes will be a disaster because the service will suffer, as the hon. Member for Eltham said in his excellent speech.

    The Bexleyheath line is served by Barnehurst and Bexleyheath stations in my constituency and by Welling station, which is in the constituency of my hon. Friend the Member for Old Bexley and Sidcup (Mr French) but is used by a number of my constituents. The changes will mean that the line will no longer enjoy off-peak or weekend services to Charing Cross. The services running will be only two trains per hour to Cannon Street and two trains per hour to Victoria.

    The Sidcup line, which serves Crayford station in my constituency, will lose the off-peak and weekend services to Cannon Street, with the majority of those services being transferred to Charing Cross, with the result that four trains per hour will go there. The timetable changes mean the loss of our loop line, with the end of the direct service to get on the Elizabeth line at Abbey Wood. That is a disadvantage for commuters who need to go to the Docklands or other places via the excellent Elizabeth line.

    The Woolwich line is served by Slade Green station in my constituency and by Erith station, which is used by a lot of my constituents in the Barnehurst and North End wards. The relevant services will go only to Cannon Street at both peak and off-peak times.

    The new timetable has met with huge dismay across our borough of Bexley, and indeed throughout other parts of south-east London. My constituents and I are bitterly disappointed by, and rather angry about, the lack of consultation on the dramatic changes that are taking place that will affect rail users and businesses across our south-east region.

    Southeastern has explained the reasons why it did not consult, which I do not accept—I know that my hon. Friend the Member for Old Bexley and Sidcup has been even more robust in that division. I advise Southeastern, and the Minister, that if it consulted on the timetable now, it would be amazed at the overwhelming opposition from people from all sections of the community, of all ages, and from all the travelling public. I remain totally unconvinced about why some of the Cannon Street services at off-peak times and at weekends cannot be substituted on the Bexleyheath line for some Charing Cross services instead.

    Southeastern has explained to me—very badly and disappointingly—that the reason for the new timetable is, as the hon. Member for Eltham said, to untangle the crossovers in the line at Lewisham and improve punctuality. I was at meetings with the hon. Gentleman about a previous consultation when that was disproved. I do not accept the views of Southeastern. It has failed to acknowledge the disruption and the added time that journeys will require in order for people to change at London Bridge, which will cause more inconvenience for our constituents when they travel.

    The Bexleyheath line has enjoyed direct services to Charing Cross since the Victoria era. A year or two ago, we celebrated the 150th anniversary of the Crayford line, which goes through Sidcup. The new timetable will see the Charing Cross to Bexleyheath line come to an end for off-peak services, with only two trains an hour at peak times, which is totally inadequate for the needs of constituents. Those commuting at that time often face delays that tend to originate from Dartford, at the kick-off, not from the crossover at Lewisham.

    The status given to Cannon Street as a major terminus area is absolute nonsense. Cannon Street is a commuter line. It is a ghost area outside the rush hour. Families would not take the train to Cannon Street to go to a Saturday afternoon matinee at the theatre or to an appointment with a doctor or consultant at a London hospital. It is unbelievably crass to suggest that that is fine. Barely anyone wants to travel to Cannon Street for non-work purposes, while Charing Cross is the most popular service for rail users travelling to London from Bexley for both work and leisure. The staff and the ambience at Charing Cross is very good, commensurate with safety and security, and there is a buzz there. I do not think there is that buzz at Cannon Street, even in the rush hour.

    Frankly, the changes are inconsiderate, totally unfair and lacking in logic. As I have mentioned, although it is a London borough, Bexley does not have a tube station. The residents therefore want a reliable, good service to get them to their place of work, hospital appointments and social events. We have fought on a bipartisan basis across my borough of Bexley and Greenwich, and also with Lewisham, to say that this is what people want and expect. In other parts of the country, such as on the Essex side of the Thames, the train service is so much better. I can never understand how it is that my personal assistant Perry Taylor can get in much quicker and easier from Billericay than we can from south-east London. We are closer to London than he is, and he is never late—I hope he will not be late tomorrow, at any rate.

    The train service available for rail users at London Bridge to get to their destinations is unacceptable. It will also add unnecessary stress and time for passengers. A number of people based at the House of Commons do not work peak times. They are going home, as we are, after 10 o’clock at night, which means that they have to change at London Bridge station. That makes things far worse and they will get home even later. I know we have more user-friendly hours in Parliament than we were used to in the past, but we were still here last night voting at 10 o’clock. The staff have to be here after that. A lot of them work in this property and are on our line down to Dartford.

    There are also vulnerable passengers, such as the elderly, those with mobility issues and parents with pushchairs, who have to navigate lifts, escalators and stairs to get on to the main concourse and on to the next line. Whereas, when they come to Charing Cross, they can go straight through to Eltham, Welling, Bexleyheath or wherever, without changing. Once they are on the train, they know they are there until they get to their destination station. Coming home late means more time, more hassle and more stress. We are here as representatives of the people to support constituents and the best service for them—not one that is convenient to civil servants and Southeastern, but one that is convenient to the people who pay the bills. That is why I am passionate and cross about the new timetable.

    One concern raised by people in Crayford is that they lose the loop around to Abbey Wood. Although that is not devastating, it is certainly disappointing, because people moved to our area in the belief that it meant that they could commute reasonably quickly into London, but that will not happen under these new proposals. A lack of connectivity with the Elizabeth line is a great disappointment, and I ask for that to be looked at again.

    Bexley borough generally has poor transport links from north to south. Buses and trains run more from east to west, though buses are impacted by traffic. There is considerably more traffic in Bexley now than there was a decade ago. We have been given no reasonable explanation why the connectivity service should be removed.

    I have had many meetings and discussions, as well as written communications, with Ministers present and past from the Department for Transport over the years, as has the hon. Member for Eltham. That includes the current Minister over the past month or two. I have also asked questions in Parliament, raised debates and collaborated with parliamentary neighbours and the leader of Bexley Council on transport issues affecting our borough. Yet we have seen no progress, despite the increasing cost of fares and the frustration for railway users.

    We need—we deserve—to see improvements finally, and we thought we were getting there with longer trains, more trains and newer trains. Does the hon. Member for Eltham remember that? We were going to get all those things. Well, they have not materialised. Now we are getting detrimental cuts to our services, just when we are trying to encourage people to go back to the office and other workplaces, and to go to the city and enjoy the recreational facilities in London, which is the greatest city in the world.

    I appreciate the time and sympathy that our new Rail Minister has given me and my parliamentary neighbour, my hon. Friend the Member for Old Bexley and Sidcup, and colleagues on the Labour Benches. He has listened and we appreciate that very much. However, the new timetable needs to be amended and changed, so that residents in south-east London—not just Bexley but all south-east London boroughs affected—have the benefit of a better service. They need to be consulted. This needs to be thought about again. We are being told that we cannot do anything because this has already been agreed with everybody, even though we did not agree with it and did not even know much about it until quite recently. We need to be consulted on changes for when the next timetables come in, because these new timetables are not fit for purpose.

  • Clive Efford – 2022 Speech on Southeastern Railway Timetable Changes

    Clive Efford – 2022 Speech on Southeastern Railway Timetable Changes

    The speech made by Clive Efford, the Labour MP for Eltham, in Westminster Hall, the House of Commons, on 6 December 2022.

    I beg to move,

    That this House has considered Southeastern railway timetable changes.

    It is genuinely a pleasure to serve under your chairmanship, Ms Harris, for the first time, I think. We are here because on 4 August Southeastern sought and got the Government’s permission to cut rail services without consultation. It is cutting two trains from the morning peak in my constituency on the New Eltham and Mottingham line, and three from the Eltham and Kidbrooke line. On the Bexleyheath line, which services Eltham and Kidbrooke, it is cutting three trains out of 15—a 20% cut in the morning peak capacity of trains that go via London Bridge. It is a similar cut in New Eltham and Mottingham, where the number of trains will go from 18 down to 16, but there is the welcome addition of one single train that goes to New Eltham via Blackfriars. Given an average of 10-car trains, the cuts on the Bexleyheath line amount to 3,000 passengers at peak time who have to find spaces on the remaining trains. It is a similar situation on the New Eltham line.

    Before the pandemic, we had PiXC—passengers in excess of capacity—on our lines. We campaigned previously for additional trains, particularly off peak, and were successful in getting them. Transport planners do not recognise that our part of south-east London is not served by the London underground and we rely very heavily on train services. The cuts take no account of that fact, nor of the fact that my constituency has a huge new development at Kidbrooke, which has had a considerable effect on the numbers of passengers getting on and off trains at Kidbrooke station.

    According to the Office of Rail and Road, there were 890,000 passenger exits and entrances at Kidbrooke station in 2010. That had risen by more than 42% to 1.5 million by 2018. During the pandemic, as we would expect, the number of exits and entrances went down to 429,000 in 2020, but it is already back over 1 million at Kidbrooke station and it is continuing to rise. There were also increases at Eltham station, but on nowhere near the scale of the increases at Kidbrooke station because of that development.

    The Kidbrooke development is approaching 7,000 homes, about half of which have been completed. Passenger entrances and exits had already increased by 640,000, as I said, but that was prior to the pandemic. Taking that as a guide, that means we will see a further 1.5 million entrances and exits at that station by the time all the properties are built. The proximity to the train station was used as justification by the developer Berkeley Homes, as well as by the Mayor of London and Transport for London, in respect of the development of 619 homes at Kidbrooke. Was that taken into consideration when the Government approved the cuts to train services?

    Back in September 2017 we all thought we had cracked the problem of overcrowding. We all campaigned to get extra trains and longer trains on the line and the Government allowed Southeastern to do that—we were told that we got 68 extra carriages. The then managing director, David Statham, said:

    “Longer trains will mean more seats, more space and more comfortable journeys…Southeastern has worked very closely with the Department for Transport and Govia Thameslink Railway to deliver this extra capacity for passengers.”

    The press release went on to say that trains to Hayes, Bexleyheath, Woolwich, Sidcup, Bromley South and Grove Park would be lengthened. We were told we were going to get extra capacity, not less. Now we are told there is a need to rationalise services post covid.

    A report on Southeastern published in July by the Office of Rail and Road shows that 2018-19 was its busiest year—but then, of course, the pandemic hit us. There were 183.2 million passenger journeys in 2018-19, but the number dropped to 40.2 million in 2019-20. In 2021-22, passenger journeys went up to 97.8 million, which is more than a 50% increase, and they are continuing to rise, so this is hardly the climate in which we should undertake cuts.

    Sir David Evennett (Bexleyheath and Crayford) (Con)

    The hon. Gentleman is doing a really good job of explaining the figures. In the London Borough of Bexley, a lot of new apartments and houses are being built and there will be increased demand.

    Clive Efford

    Absolutely. I do not think any account has been taken of the increased demand from the additional development in our part of London—certainly not the demand from the very big development at Kidbrooke. We are seeing considerable growth and no one can know where it will end.

    We see a similar pattern in passenger kilometres. Again, the highest number was in 2018-19. That dropped massively in 2020-21, but more than doubled in 2021-22. For planned trains—the trains agreed with Southeastern and Network Rail the night before they run—2018-19 was the busiest year, with 654,389 trains. The number dropped to 527,855 in 2020-21, then still further in 2021-22 to 523,965—that is a 20% drop in planned trains. If we look at the performance figures—bear in mind that the Government’s rationale is that running fewer trains makes the trains more efficient—we do not see the huge improvement in performance that we would expect from running considerably fewer trains, so the Government’s argument that fewer is better is not borne out by the facts.

    The rationale is the old chestnut that the all the trains crossing over west of Lewisham create too much congestion, which leads to knock-on effects and delays. That argument was rolled out several years ago when Southeastern wanted to take away the Victoria service from the Bexleyheath line. It was the same story: “It’s all those trains crossing over west of Lewisham.” Back then, I spoke to some rail experts about the problem and they told me that what Network Rail and Southeastern were saying was complete nonsense. There is not a problem with trains crossing over at that point unless there is bad maintenance and a lack of investment in the infrastructure.

    We need to be clear about what is happening. In Transport questions recently, the Minister said to me:

    “It is not just about taking down some costs; it is also about simplifying the line structure, so that at Lewisham, for example, there will not be as many trains crossing.”—[Official Report, 24 November 2022; Vol. 723, c. 436.]

    First, this is about cost cutting—the Minister has made that clear. There is then this issue of too many trains crossing. It might be fine to say that to people who still have trains, but we are having trains cut. Obviously, our trains cannot cross if they do not exist, so actually what the Minister says is true: the service will improve because the trains are not there. If we follow that logic, we should perhaps just get rid of all the trains; that would solve the problems on our railway.

    When I first asked questions about these cuts, I was told that cutting peak-time trains would reduce cancellations and delays. When I pressed further, I was told:

    “The number of train services in the new timetable is broadly very similar to the current timetable on both of these routes.”

    I pushed a bit further, because that answer denied that there are cuts on the Bexleyheath and Sidcup lines. The idea that the trains will run better becomes a self-fulfilling prophecy, because nobody can be criticised for a delayed train that does not exist. Given the logic of the solution that running a future railway should be based on cuts to services, I suspect we will be back here again listening to the Minister explain why we need to cut trains further because we still have a problem of poor maintenance and lack of investment in the infrastructure west of Lewisham.

    First, the Government tried to avoid admitting they had approved the cuts without consultation; I was told that they would reduce cancellations, which is not what I had asked. Then, the Government said there would be a similar number of trains, when I had asked how many cuts there would be. It has been a shameful attempt by the Government to avoid their responsibility for approving cuts to our services. Admitting now that there are cuts is a welcome step, but that will make everyone else’s trains run on time while we have to endure cuts.

    The new timetable has been imposed without listening to our constituents. It is too late to change that and the Government are determined to press ahead. What is the Minister going to do to monitor the situation so we do not go back to overcrowded trains and a poor service after the new timetable is introduced? That is what we endured before and I see nothing in the decision to cut our train services that is going to change it.

  • Jesse Norman – 2022 Speech on Blackpool Airport

    Jesse Norman – 2022 Speech on Blackpool Airport

    The speech made by Jesse Norman, the Minister of State at the Department for Transport, in Westminster Hall, the House of Commons on 6 December 2022.

    It is a delight to see you in the Chair, Mr Gray. I am also delighted to respond to the very good speech and useful interventions made by my hon. Friends the Members for Fylde (Mark Menzies), for Witney (Robert Courts) and for Blackpool South (Scott Benton). I am a man with a family background in general aviation. Many years ago, I got a private pilot licence, and my uncle designed the Britten-Norman Islander. I do not know whether Members recall the moment in the James Bond film “Spectre” when the plane is flying along and gets its wings knocked off and goes skiing. That was a Britten-Norman Islander designed by my uncle, so we have a certain amount of traction in this field, and a certain sympathy for the issues raised by my hon. Friend the Member for Fylde.

    Let me be clear that within the Department for Transport we recognise the importance of Blackpool airport to the region. We also recognise it as the centre of the Blackpool airport enterprise zone, set up as a hub for business, medevac, flying schools and general aviation. I note that this is the second debate that we have had this year on this topic, or a related topic. I thank my hon. Friend the Member for Blackpool South for his earlier debate, which I note that my hon. Friend the Member for Witney responded to very ably as the Minister. There is a certain circularity here, but there is also a sense of energy and purpose that all three of my hon. Friends have rightly brought to the issue. I thank them very much for what they have said.

    As my hon. Friends have been at pains to emphasise, the UK enjoys what is in many ways a world-leading competitive commercial aviation sector, with airports and airlines operating and investing to attract passengers and respond to demand. Airports themselves have a key role to play as part of the sector. Where opportunities for growth exist, local partners can come together with the industry to develop the business case for new commercial flights. My hon. Friend the Member for Fylde rightly focused on the key goals of commercial development and sustainability of the airport, levelling up, and Union integration.

    It is for airports, local authorities, local enterprise partnerships, local businesses and other stakeholders to try to come together to build the case for commercial flights and work with airline partners to create new connections for their communities. Airlines will ultimately determine the routes they operate based on their own assessment of commercial viability. As my hon. Friend the Member for Fylde said, it is notable that Blackpool has a proud history of innovation in this area as well as a historically thriving tourism industry. The airport was used as recently as 15 or so years ago—perhaps even less. We need to consider the question of the commercial development of the airport in the context of the wider processes of levelling up and regeneration.

    As hon. Members will know, air travel is provided almost entirely by a competitive market. There is no bespoke funding or support from Government for new routes, but there is support for domestic connectivity. The 50% reduction in domestic air passenger duty was designed to provide that support. It was part of a package of air passenger duty reforms. There was a new reduced domestic band to support regional connectivity and a new ultra-long-haul band to align air passenger duty more closely with environmental objectives. That begins from April next year.

    The question of a targeted APD is very interesting. I have no doubt, speaking as a former Treasury Minister in part, that the thought of a hypothecated or targeted APD will cause severe tremors and, dare I say, nervous palpitations within the Treasury—for many understandable and obvious reasons. As Ernie Bevin once said in a different context,

    “Open up that Pandora’s box, you never know what Trojan horses will jump out.”

    Robert Courts

    The Minister makes a good point. The 50% APD cut was welcome, but my point is about what the Department calls open PSOs. Those are not a further Treasury subsidy, but simply the removal of APD on routes that are non-operational—where the Treasury is getting no revenue or marginal revenue. There is a business growth opportunity there. That is what I am asking him to push the Treasury on, though I appreciate it is not in his gift.

    Jesse Norman

    That clarification is very helpful. There is a way of thinking with open PSOs that is not just tied to APD, but I will come back to the question of PSOs in general.

    We have some support for administered connectivity through domestic APD. We are continuing to explore alternative routes and are seeing whether there are other ways to address this. In the context of PSOs, I will lay a slightly different emphasis from my hon. Friend the Member for Fylde. It is important to recognise that the PSO policy as it presently is set up is designed to support not new flight—that is the question being raised by my hon. Friend the Member for Witney—but routes that have previously been operated commercially or are now at risk of being lost.

    The question of new routes is somewhat different. The routes that are funded at the moment, at least across the UK, are modest. There are three public service obligations: from Londonderry/Derry to Stansted, Newquay to London Gatwick, and Dundee to London City. An additional 17 PSOs connect the highlands and islands of Scotland, which are wholly within the borders of Scotland. The administration and funding of those, by agreement with the Department for Transport, is the responsibility of the Scottish Government.

    We operate within a context of existing policy. To the point about the stance of the local authority, as raised by colleagues, it is important to say that my officials have so far received no requests from the local authority to discuss the need for any PSO routes from Blackpool airport—I will leave local colleagues to decide how they want to interpret that. Of course, if there was going to be PSO support, it would have to be initiated and agreed with the local authority, and the fact that we have heard nothing from them is not helpful to the cause being promoted.

    As I say, PSOs are considered in the context of commercial services that either are at risk of being lost or have recently—generally speaking, within the past two years—been lost. The loss referenced by my hon. Friend the Member for Fylde goes outside that remit and therefore does not fit within the existing policy. If and when it did apply, which would undoubtedly be part of the same process as the consideration of any new routes in the future, which I will come on to shortly, it would be through a business case, warmly and widely agreed locally, in which the local authority would play a leading role. That is very important. Hon. Friends will be aware that levelling up works effectively only when everyone is lined up in the same way. When business, the local authority, local Members of Parliament and other key stakeholders are so lined up, it can be enormously effective and successful.

    As a reminder to all, eligible routes should be ones in which there are historically no viable alternative modes of travel and where it is deemed and demonstrated to be vital to the social and economic development of the region.

    It is important to say that if and when a PSO is granted under the current policy, there must then be a procurement exercise to find an airline, which, in turn, needs to be a full and open tender for selection. The subsidy provided is based on the airline’s operating losses on that route, which it must submit as part of a tender bid. It is a very context-dependent decision. Of course, those things would be independently assessed, as any new approach would have to decide how, where there had not been a prior existing commercial flight, a non-distortive method of subsidy and support could be provided.

    Let me pick up a couple of points relating to the Union connectivity review that were rightly raised by colleagues. As hon. Members will recall, in November 2021, Sir Peter Hendy published an independent review designed to explore how improvements to transport connectivity between Scotland, Wales, Northern Ireland and England could boost not just economic growth but access to opportunities, everyday connection and social integration. The review identified the key importance of airports and air connectivity by providing connectivity both into London and in and between peripheral regions, which gets to the points raised by colleagues today.

    As hon. Members might imagine, the Government are considering our response to the Union connectivity review, and my colleague Baroness Vere leads on the issue of aviation. Our response will be Department-wide, because it is a multimodal strategic review in nature. As part of that, we are exploring further opportunities to utilise PSOs in order to support regional connectivity and the levelling-up agenda.

    My officials have already been actively considering how airport slots are allocated in the UK. Now that the UK has left the EU, there is an opportunity for the Government to legislate to improve the slots system to ensure it provides the connectivity that UK passengers need. That can be expected to have knock-on effects on economic growth around the country.

    Regional airports play an important role in levelling up. It is important to recognise that that is not just about the foundation of the wider UK aviation sector; it is also about the business opportunities that can be directly generated as a result of the supply chains and other enterprise engagement. Members will recall that the Government published a strategy on the future of aviation, “Flightpath to the future”, which sets out a vision for the sector over the next 10 years. It includes not just connectivity, which we have discussed, but workforce, skills, innovation and decarbonisation.

    We expect a naturally low-carbon approach to the regeneration of any new airports for all the reasons my hon. Friend the Member for Fylde set out. That is a potential source of advantage if it is properly handled. It is our goal that UK domestic flights should be net zero by 2040, and airport operations, which are an important potential ancillary contributor to carbon emissions, should be zero emission by 2040. We are providing significant support for that, not just for sustainable aviation fuels but for the commercialisation of those plants and other research and development co-investment —in particular, through the Aerospace Technology Institute. Alongside that, the levelling-up agenda, jet zero and net zero provide the context within which there can be diversification, a deepening and broadening, and a very significant boost to the activity conducted in and around airports.

    I want to give my hon. Friend a moment to respond—

    James Gray (in the Chair)

    No, you don’t. Not in a half-hour debate.

    Jesse Norman

    In any case, I will not abuse the privilege by speaking further. I thank my hon. Friend the Member for Fylde very much for his comments, and I thank my hon. Friends the Members for Witney and for Blackpool South for their interventions and the interest they have shown in this issue.

  • Mark Menzies – 2022 Speech on Blackpool Airport

    Mark Menzies – 2022 Speech on Blackpool Airport

    The speech made by Mark Menzies, the Conservative MP for Fylde, in Westminster Hall, the House of Commons, on 6 December 2022.

    I beg to move,

    That this House has considered public service obligation funding and Blackpool Airport.

    As always, it is a privilege to serve under your chairmanship, Mr Gray. Blackpool airport has a long and proud history—from hosting the UK’s first official public flying meeting to playing its part in the war effort as RAF Squires Gate. During peacetime, the airport’s focus turned to private and commercial aviation. The arrival of low-cost air travel in the early 2000s saw the airport truly take off and resulted in a fivefold increase in passenger numbers, which peaked at more than 500,000 in the late noughties.

    Changes in ownership and contractual issues with airlines triggered a period of decline. Passenger numbers halved from the peak of 500,000 in 2014, and that year saw the last commercial flights from the airport. Since then, I have fought to preserve the site’s viability for scheduled passenger flights, including by opposing development that would have left the airport with a shortened runway. The airport is now owned by Blackpool Council, which has brought much-needed stability and security. I share the ambition of the airport team to use the Government’s enterprise zone investment to make the most of the site. That includes exploring how scheduled passenger flights can return.

    In June this year, I welcomed the then Prime Minister to Blackpool airport, along with my hon. Friend the Member for Blackpool South (Scott Benton). Prior to that, in March, I hosted a visit from the then Transport Secretary, who is now the Business Secretary. Most recently, the Northern Ireland Secretary visited the airport. On all three occasions, we highlighted the potential of Blackpool airport and discussed the possibility of kick-starting the revival of passenger flights. Nobody is expecting the immediate return of major airlines flying holidaymakers to the Costas, but there are opportunities to explore historic and important connections that will not only greatly benefit Blackpool but improve transport links between the regions of the United Kingdom.

    Public service obligation routes are connections to which the Government provide substantial subsidies that open up routes that would otherwise not be commercially viable. Current UK Government rules dictate that PSO flights must be between London and a regional airport. That does not apply to devolved Governments, and Scotland has been particularly effective at using PSOs to support connections between the central belt, highlands and islands. I checked this morning and found that Blackpool airport is slightly more than an hour’s drive from Manchester and Liverpool airports, and therefore qualifies for PSO flights to London.

    PSO flights would make it easier for people in Lancashire to travel for business, leisure or onward connections and would support the Government in delivering on the levelling-up promise to coastal communities, such as those I serve in Fylde. However, this must be about more than just improving access to London. The approach of focusing solely on London is out of tune with the Government’s commitment to levelling up and the future of our Union. Airports in London and the south-east have long struggled with runway capacity.

    I want the PSO rules to change to allow a shift in emphasis to connecting our nations and regions. Indeed, that idea is supported by Sir Peter Hendy, who lists it among his recommendations in the Government’s Union connectivity review. As Sir Peter points out in the review, new regional PSO routes would likely be cost-neutral to the Treasury. This opportunity to boost regional growth, support levelling up and bolster links within the Union should not be missed.

    Robert Courts (Witney) (Con)

    My hon. Friend is making extremely powerful points. The House will know that I was Aviation Minister until the summer, and I was lucky enough to visit his outstanding airport and meet the energetic team there. I can see how important it is to his area.

    He mentioned a couple of points that also have national importance, particularly that of PSO policy connecting not just with London but between regions. PSOs traditionally rely on subsidy—

    James Gray (in the Chair)

    Order. Interventions must be brief.

    Robert Courts

    I beg your pardon, Mr Gray. Has my hon. Friend considered the role that targeted air passenger duty relief—not a direct subsidy, but targeted APD relief —could play on routes that are non-operational or marginal?

    Mark Menzies

    I thank the former Minister for his intervention; he brings some important material to the debate. I hope the Minister will consider that sort of targeted APD relief in his response. It opens up another way to support the recommencement of flights from Blackpool to airports around the United Kingdom, which is incredibly important.

    I return to the point I was making. As Sir Peter points out in his review, new regional PSO routes would likely be cost-neutral to the Treasury. For example, Blackpool Airport has historic links to Northern Ireland, with a route to Belfast the last route to run commercially from the airport; it ended only because of contractual and licensing issues with the operation.

    Blackpool has numerous advantages over alternatives in the north-west, being cheaper to operate from than Manchester and Liverpool. Given its proximity to the airport enterprise zone in my constituency and Blackpool town centre, there is a real possibility of desk-to-desk travel time of little over an hour and half for Anglo-Irish business. PSO routes to places such as Belfast and Londonderry could potentially be the first steps towards greater regional connectivity to places such as Scotland, and in particular the central belt, which has strong cultural and economic ties to Blackpool.

    Scott Benton (Blackpool South) (Con)

    My hon. Friend has set out a powerful case for reforming public service obligation routes. I am sure he would agree that the Government have a good record on regional aviation so far, not just with the cut to air passenger duty but with the measures in the 10-point aviation plan and the regional connectivity review. However, Blackpool Airport is owned and run by Labour-run Blackpool Council. Does my hon. Friend agree that the council must do far more to look for opportunities to develop the airport and regional flights?

    Mark Menzies

    My hon. Friend makes an important point, in that the airport is owned and run by the council. Much of that I welcome, because under the previous private ownership there was a danger of that asset being run into the ground and developed for non-airport-related purposes. That would have been of great concern to me. There is an opportunity now for the Government to work in conjunction with the council to raise the ambition of the airport owners—the council—to seek ways to stimulate and bring forward flights from the airport. I am sure my hon. Friend and I will work with all parties to try to secure that.

    Teesside Airport is a possible destination and an inspiration for what a future Blackpool Airport might look like. I believe the PSOs can be a vital catalyst and a first step towards the return of flights from Blackpool, ultimately to continental Europe. Importantly, those opportunities may not be seen as contrary to environmental commitments. Just last week, easyJet and Rolls-Royce trialled the first jet engine powered by hydrogen, providing a glimpse of a lower-carbon future. Blackpool Airport has ambitions to be a leader in sustainable short-haul aviation, be that through electric and hydrogen-powered aircraft or innovation through new low-carbon fuels. The airport is keen to include electric charging and hydrogen fuelling infrastructure in its redevelopment plans.

    Regional airports, such as Belfast and Londonderry, are within the range of the generation of electrical aircraft in development. Currently, the opportunity to introduce those on a commercial basis is very much on the horizon. As we look to a low-carbon future, Blackpool provides a fantastic opportunity to support and showcase the development of a clean, green short-haul flight technology.

    Furthermore, as Lancashire continues to grow as a green energy hub, with its strategic location on Britain’s energy coast for wind and tidal power, and its position in the north-west nuclear arc, we can use the flights to connect other areas, leading to the technologies of the future. There are 41,000 workers in the energy and environment sector in Lancashire. Those industries have a significant footprint for Scotland and the north-east of England and will continue to grow in future decades. The Fylde coast is already training the next generation of engineers in those industries at the renowned Blackpool energy college which, incidentally, is located on the site of the former terminal building.

    Beyond the Fylde and Blackpool, the airport’s location gives it great onward connections to Lancashire and the wider north-west, as it is just minutes from the M55. The south Fylde line stops several hundred metres away, giving quick access to Lytham St Annes and Kirkham in my constituency, as well as onwards to Blackpool and Preston, the latter providing connections on to local Lancashire services, the west coast main line, and the future High Speed 2.

    Blackpool airport is a fantastic asset for Lancashire, with potential to support its manufacturing and energy sectors, as well as its fantastic tourism sector. Its closure to commercial flights remains a key issue locally, and residents the length and breadth of the Fylde coast continue to push for their return. The team at the airport have the drive and vision to get this off the ground. They are eager to make a success of the airport, embracing new low-carbon technologies and the opportunities that they present. An initial terminal building may not need to be large—just sufficient to get passengers checked in and safely on to their flights, as part of a longer-term vision to add further routes and investment to the airport’s infrastructure. We have seen that work elsewhere, and it can work again at Blackpool airport.

    Levelling up, strengthening our Union and the drive for net zero are at the very heart of the Government’s mission. With a little help to get things off the ground, Blackpool airport can support all three objectives. All that is required are small tweaks to the rules surrounding PSOs, combined with relatively minor investments and alternative support, such as targeted relief on air passenger duty for routes from small regional airports—again, estimated to be cost-neutral to the Treasury. This is a good opportunity, and we should not pass it up. I know that the Minister will recognise that, and I hope that he will take the steps required to reinvigorate Blackpool airport.

  • Huw Merriman – 2022 Statement on the A1 Northumberland-Morpeth to Ellingham Development Consent Order

    Huw Merriman – 2022 Statement on the A1 Northumberland-Morpeth to Ellingham Development Consent Order

    The statement made by Huw Merriman, the Minister of State at the Department for Transport, in the House of Commons on 6 December 2022.

    I have been asked by the Secretary of State for Transport, my right hon. Friend the Member for Forest of Dean (Mr Harper) to make this written statement. The statement confirms that it has been necessary to extend the deadline for the decision for the A1 Northumberland – Morpeth to Ellingham Development Consent Order under the Planning Act 2008.

    Under section 107(1) of the Planning Act 2008, the Secretary of State must make his decision within three months of receipt of the Examining Authority’s report unless exercising the power under section 107(3) to extend the deadline and make a statement to the House of Parliament announcing the new deadline.

    The Secretary of State received the Examining Authority’s report on the A1 Northumberland – Morpeth to Ellingham Development Consent Order application on 5 October 2021. The current deadline for a decision is 5 December 2022, having been extended from 5 January 2022 to 5 June 2022 by way of written ministerial statement of 15 December 2021 and then to 5 December 2022 by written ministerial statement of 6 June 2022.

    The deadline for the decision is to be further extended to 5 September 2023—an extension of nine months. The reason remains as that set out in the written ministerial statement of 6 June 2022.

    The decision to set a new deadline is without prejudice to the decision on whether to give development consent for the above application.

  • Mark Harper – 2022 Statement on Railway Infrastructure in England and Wales

    Mark Harper – 2022 Statement on Railway Infrastructure in England and Wales

    The statement made by Mark Harper, the Secretary of State for Transport, in the House of Commons on 1 December 2022.

    I should like to make a statement on the settlement for the next five-year funding period for railway infrastructure in England and Wales.

    Maintaining and renewing our country’s rail infrastructure is critical to delivering the railway that passengers and freight companies expect, and for supporting economic growth. Every five years the Government are required to set out what we wish to achieve from the operations, maintenance and renewal of the railway. This is done through a document known as a high-level output specification, and the funding available is set out through a statement of funds available.

    I am today, 1 December, publishing the objectives and funds available for operational railway infrastructure in England and Wales for the next control period, control period 7. This covers the period April 2024 to March 2029.

    The Government fully recognise the critical role that rail services played for business, key workers and our society during the covid-19 pandemic, and the vital role that they play in connecting communities and supporting economic growth.

    The high-level output specification makes it clear that the Government will press ahead with rail reform, addressing the challenges facing the sector, such as fragmentation and outdated working practices, with a strong continued focus on operations, maintenance and renewal. This strong continued focus is important in supporting a safe, efficient and reliable railway for passengers and freight customers.

    Achieving these objectives will be facilitated by significant Government investment as set out in the statement of funds available, with Network Rail spending around £44 billion over the period April 2024 to March 2029. The Government now expect Network Rail to develop detailed plans to deliver on these objectives, working closely with its customers. These will then be subject to strong and effective scrutiny by the Office of Rail and Road, as independent regulator, to develop robust, credible, value-for-money plans for the next control period.

  • Mark Jenkinson – 2022 Parliamentary Question on Avanti Rail Services

    Mark Jenkinson – 2022 Parliamentary Question on Avanti Rail Services

    The parliamentary question asked by Mark Jenkinson, the Conservative MP for Workington, in the House of Commons on 1 December 2022.

    Mark Jenkinson (Workington) (Con)

    The number of daily services from Carlisle and Penrith to Euston that my constituents use is significantly reduced from previous levels, and the services that are running are timetabled at a much longer length than they used to be. Despite that, the percentage of services that are running on time hardly hits double figures. It is not the fault of my fare-paying constituents that Avanti has chosen short-term cost savings over driver training. Why are we delaying the inevitable, and when will we strip Avanti of the contract?

    Huw Merriman

    Again, I am sorry for the experiences that my hon. Friend and his constituents have had to endure. It takes about 18 months to fully train a driver. A lot of hon. Members will find that extraordinary, but I sat in a cab on Monday and I saw that it is a technical and difficult job. However, there may be more improvements that we can make. During covid, there was a hold-up in what would have been the usual 18-month period, because it was not possible for the unions to have workforce next to workforce for health and safety reasons. However, I again make the point that we should not rely on rest-day working arrangements. We should have driver resilience in place so that we can fully run a seven-day train operation. That requires not only us to implement change, but the workforce, through the unions, to accept that change. I very much hope that they will and that all hon. Members will do everything they can to persuade them and make that case.