    The below Parliamentary question was asked by Greg Mulholland on 2016-06-07.

    To ask the Secretary of State for Transport, for what reasons the Sheffield to Rotherham tram-train scheme has been delayed.

    Andrew Jones

    The Department for Transport and South Yorkshire Passenger Transport Executive, the joint funders of the tram train pilot project, have been advised that Network Rail has initiated a review of the current programme of works needed to adapt their infrastructure to operate the tram train vehicles between Meadowhall South and Rotherham Parkgate.

    The Department understands that Network Rail has encountered significant issues with the approval of new bespoke electrification equipment needed to operate the tram train vehicles. The joint funders are clearly disappointed by this further delay.

    The current programme showed delivery of these works by early spring 2017, however until the outcome of the Network Rail review is known, no further details can be provided.

  • Greg Mulholland – 2016 Parliamentary Question to the Department for Transport

    Greg Mulholland – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Greg Mulholland on 2016-06-07.

    To ask the Secretary of State for Transport, what recent discussions he has had with Network Rail on delays to the Sheffield to Rotherham tram-train scheme.

    Andrew Jones

    The Department for Transport and South Yorkshire Passenger Transport Executive, the joint funders of the tram train pilot project, have been advised that Network Rail has initiated a review of the current programme of works needed to adapt their infrastructure to operate the tram train vehicles between Meadowhall South and Rotherham Parkgate.

    The Department understands that Network Rail has encountered significant issues with the approval of new bespoke electrification equipment needed to operate the tram train vehicles. The joint funders are clearly disappointed by this further delay.

    The current programme showed delivery of these works by early spring 2017, however until the outcome of the Network Rail review is known, no further details can be provided.

  • Matthew Offord – 2016 Parliamentary Question to the Department for Transport

    Matthew Offord – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Matthew Offord on 2016-06-07.

    To ask the Secretary of State for Transport, what assessment his Department has made of the potential merits of installing a continuous noise barrier on the eastern side of the M1 passing through Mill Hill.

    Andrew Jones

    On the M1 between the A41 near Apex Corner and M1 junction 2 in the Mill Hill area, four areas are identified by the Department for Environment, Food and Rural Affairs noise mapping process as being noise ‘Important Areas’ which require further investigation.

    One of these areas is located along the M1 southbound carriageway from the beginning of Station Road to Woodland Way, opposite Mill Hill Broadway station and is currently being studied to see if a noise barrier is practical here. There are a number of issues to be investigated, including whether a barrier can be put in place over a structure and along an embankment.

  • Greg Knight – 2016 Parliamentary Question to the Department for Transport

    Greg Knight – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Greg Knight on 2016-06-07.

    To ask the Secretary of State for Transport, what steps he is taking to encourage more cyclists to use cycle lanes rather than cycling on the main highway; and if he will make a statement.

    Mr Robert Goodwill

    Cycle tracks, where provided, offer cyclists an alternative to cycling in the carriageway. However, the decision to use a lane or not will depend on the individual. We have no plans to make to make the use of lanes mandatory.

  • Greg Knight – 2016 Parliamentary Question to the Department for Transport

    Greg Knight – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Greg Knight on 2016-06-07.

    To ask the Secretary of State for Transport, what plans he has to reduce congestion on the M25 motorway; and if he will make a statement.

    Andrew Jones

    Highways England is developing road schemes at several locations to help reduce congestion on the M25 including:

    • Upgrade of the M25 between junction 10 (A3) and junction 16 (M40) to a smart motorway, with start of construction before the end of 2019/20.
    • A far reaching study to look into the south-west quadrant of the M25 to address the increasing demand on this section.
    • An upgrade of junctions 10, 25 and 28 to have started construction by the end of 2019/20.
  • Greg Knight – 2016 Parliamentary Question to the Department for Transport

    Greg Knight – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Greg Knight on 2016-06-07.

    To ask the Secretary of State for Transport, for what reasons the imposition of 50mph average speed limits on three stretches of M1 motorway, one in Northamptonshire and two in Leicestershire, were carried out consecutively rather than concurrently to avoid delays for motorists; and if he will make a statement.

    Andrew Jones

    Highways England has carefully planned the roadworks on the M1 to ensure that works are carried out as concurrently as possible. This is to reduce the impact on motorists wherever possible, whilst delivering increasing levels of investment to improve the motorway network and enable economic growth.

  • Michelle Donelan – 2016 Parliamentary Question to the Department for Transport

    Michelle Donelan – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Michelle Donelan on 2016-06-07.

    To ask the Secretary of State for Transport, what assessment he has made of the potential merits of registering bicycles with the DVLA.

    Mr Robert Goodwill

    Our assessment of the registration of bicycles indicates it would require a licensing process similar to that for cars and motorcycles. As there are in excess of 20 million bicycles in Great Britain and many change hands through second hand sales, keeping track of this would be difficult and expensive. The costs of its administration would far outweigh the revenue received and indeed any benefits received from it.

  • Michelle Donelan – 2016 Parliamentary Question to the Department for Transport

    Michelle Donelan – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Michelle Donelan on 2016-06-07.

    To ask the Secretary of State for Transport, when the age requirements for the driving test were last reviewed.

    Andrew Jones

    The minimum age for driving tests were last reviewed in 2010 following a widespread public consultation in 2009 on changes to the driver licensing and testing regime. The possible changes included amongst others, minimum ages, medical requirements, driving licence security and driving test vehicle requirements. The Government currently has no plans to alter minimum ages.

  • Robert Flello – 2016 Parliamentary Question to the Department for Transport

    Robert Flello – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Robert Flello on 2016-06-07.

    To ask the Secretary of State for Transport, what discussions his Department has had with trades unions officials representing Highways England traffic officers on the potential danger of serious injury or death arising from trying to move a heavy goods vehicle from a live lane using a Highways England traffic officer 4 by 4 vehicle.

    Andrew Jones

    The Trade Union that represents Highways England Traffic Officers was consulted throughout the life of the enhanced carriageway clearance project, which focused on carriageway clearance of vehicles of all types. Trade Union representatives attended a number of meetings and specific workshops.

  • Robert Flello – 2016 Parliamentary Question to the Department for Transport

    Robert Flello – 2016 Parliamentary Question to the Department for Transport

    The below Parliamentary question was asked by Robert Flello on 2016-06-07.

    To ask the Secretary of State for Transport, how much compensation has been paid from the public purse to owners of heavy goods vehicles damaged as a result of being moved by Highways England traffic officers from live lanes to (a) hard shoulders and (b) emergency refuge areas in the last 12 months.

    Andrew Jones

    Highways England has not received any claims relating to heavy goods vehicles damaged as a result of being moved by Highways England traffic officers in the last 12 months. Hence, no compensation has been paid.